EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 21, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Cullowhee, North Carolina. Completed plans call for the renovation of a educational facility.

The state reserves the unqualified right to reject any and all proposals. Phase 1: This phase shall include all work associated with the replacement of the existing cooling tower, water-cooled chiller, steam-to-hot water heat exchanger and their associated controls and appurtenances. This phase shall also include the replacement of the existing windows throughout the original Killian building. Phase 2 (Future): This phase shall include all work associated with the replacement of the existing two-pipe, chilled water/ hot water, constant air volume air handling units and their associated ductwork and controls with new four-pipe, chilled water / hot water, variable air volume air handling units and variable air volume terminal units with hot water reheat. The existing acoustical hung ceilings shall be replaced and the existing surfaced mounted lighting fixtures shall be reinstalled as indicated. The existing louvers on doors and transoms shall be covered up and sealed. The last day for questions will be January 21, 2025 at 5:00 pm. All questions should be emailed to sean.rask@rmf.com. Replace existing ~200-ton cooling tower and water-cooled chiller. Replace the existing steam system components including the steam condensate return unit, steam traps and steam-to-hot water heat exchanger. Replace existing refrigerant exhaust fan serving existing Chiller Room. Replace existing windows located throughout the original Killian building

Bid Results

Educational

$2,600,000.00

Public - State/Provincial

Renovation

65

30

11

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
57
Bidding Soon
797
All Active Projects
397
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2025

March 3, 2025

img_map_placeholder

91 Killian Bldg Ln, Cullowhee, NC


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

WCU Killian Building HVAC Upgrades and Window Replacement (Phase 1)

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.