Published March 26, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Ellicott City, Maryland. Completed plans call for the renovation of a educational facility.

The Howard County Public School System (HCPSS) requests your bid for the Lime Kiln Middle School HVAC Replacement as specified in the bid documents. All Questions shall be directed, in writing, no later than 10:00 A.M., April 1, 2025 to the Construction Manager Ms. Robin Hodges, Turner & Townsend, robin.hodges@turntown.com . The Howard County Public School System is under no obligation to respond to any questions that are received after the cutoff date and time. Only answers provided via an addendum issued by the HCPSS will be binding. Under no circumstances are bidders, including third party vendors or their staff, to contact any other HCPSS Staff, employees or any related constituency for purposes associated with this solicitation, including but not limited to, obtaining or providing information. Bidders failing to comply with this requirement may be disqualified. Minority Business Enterprise Maryland Department of Transportation (MDOT) Certified Minority Business Enterprises are encouraged to respond to this solicitation notice. The Contractor or supplier who provides materials, supplies, equipment and/or services for these construction projects #1 (Interior) and #2 (Exterior) shall attempt to achieve the MBE goals for each projects contract package as follows: All Prime Contractors, including certified MBE firms, when submitting their Bids or Proposals as General or Prime Contractors are required to attempt to achieve this goal from certified MBE firms. In accordance with the Governor's Office of Minority Affairs, a MBE Prime contractor may self-perform up to 50% of the overall MBE contract goal and up to 100% of any one MBE contract subgoal, provided that the certified MBE prime contractor is properly identified on the MBE participation schedule and the firm is NAICS code-certified to do the work. Instructions pertaining to the Bid Bond, Surety Checks, Performance and Materials Payment Bond requirements are contained in the bid documents. The conditions contained in this Notice to Bidders, Invitation to Bid, are a part of the bid documents. Bid Bond shall be in the amount of 5% of the Base Bid. The bonding company furnishing the Bid Bond shall attach to the Bid Bond, or deliver to the Owner Purchasing Office within 24 hrs. upon request the following statement, signed by an authorized representative for the bonding company: As surety for (Name of Contractor), (Name of Bonding Company), hereby agrees to furnish the 100% Performance, Labor and Materials Bonds, as required by the specifications for the (Name of Project), on behalf of the Contractor, in the event that such firm be the successful bidder for this project. Failure to provide this statement may be cause to reject submitted bid. Liquidated Damages in the amount of $1,000.00 per calendar day will be assessed for any delays in achieving Substantial Completion, except as noted in Article 8 of the General Conditions for the Contract for Construction The Board reserves the right to waive any informality in, or to reject any or all bids.

Sub-Bidding

Educational

$3,011,068.00

Public - County

Renovation

3

32

88

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Starting and Adjusting, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Demonstration and Training, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Asbestos Remediation
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation, Membrane Roofing, Built-Up Bituminous Roofing, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Fire-Resistant Joint Sealants, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Storage Specialties, Lockers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Audio-Video Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Rugs and Mats, Runners
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Identification for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Storm Drainage, Roof Drains, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Pneumatic and Electric Control System for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Terminal Units, Air Outlets and Inlets, Central Heating Equipment, Breechings, Chimneys, and Stacks, Gas Vents, Heating Boilers, Condensing Boilers, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Fan Coil Units, Unit Ventilators
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Interior Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Grading, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Screening Devices, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Water Utilities, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Lifting Devices, Clamps, Lifts
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
117
Bidding Soon
2,293
All Active Projects
990
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2025

June 9, 2025

img_map_placeholder

10920 Clarksville Pike, Ellicott City, MD


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Lime Kiln Middle School HVAC Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.