EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 30, 2025 at 7:00 PM

Updated October 1, 2024

New construction of a retail development in Monticello, Georgia. Completed plans call for the construction of a retail development; and 4,165-square-foot retail development.

Construction of a new Jasper County Community Food Bank to be located at the Northeast corner of Freedonia at Middlebrook Pond Roads. This project is a 4,165 gsf pre-engineered enclosed metal building plus a 1,451 gsf covered drive-through. The building will include wood-framed office partitions, 2 overhead doors, 4 hollow metal personnel doors, one truck dock, and will be fully air conditioned. Construction in this contract is limited to the building, earthwork extending ten feet from the building, and minor concrete slabs on the site. The balance of site work, septic system, and water well will be accomplished under a separate contract(s) Bonds All bids must be accompanied by a Bid Bond in an amount not less than 5% of the amount bid. The Successful Bidder, if awarded the Contract, will be required to furnish a Performance Bond and Payment Bond, each in the amount of 100% of the Contract Amount. The surety company on the contract Performance Bond shall be a surety company authorized to do business in the State of Georgia. Said bond and surety shall be subject to approval by the attorney for the Owner. Insurance Proof of General Liability Insurance and Workman’s Compensation Insurance will be required with the Jasper County Board of Commissioners listed as an additional insured. License All contractors are hereby notified that they must have proper license as required under the state laws governing their respective trades. Attorneys-in-fact who sign Bid Bonds must file with the bond a certified and effectively dated copy of their Power of Attorney. This shall be attached to the Bid Bond The Owner reserves the right to reject any and all bids, to waive informalities, to waive minor irregularities, and to accept the lowest or best bid. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 45 days. Bids will be received for Single Prime. All proposals shall be lump sum

Bid Results

Retail

$838,849.00

Public - County

New Construction

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
87
Bidding Soon
1,370
All Active Projects
629
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2025

March 27, 2025

img_map_placeholder

Freedonia Rd & Middlebrook Pond Rd, Monticello, GA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Jasper County Community Food Bank

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.