EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 27, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a bridge / tunnel in Washington, District of Columbia. Completed plans call for site work for a bridge / tunnel.

Clark Construction Group, LLC is soliciting proposals from Disadvantaged Business Enterprise (DBE), Women Business Enterprise (WBE), and suppliers to submit bids for the Early Work Package of the Piney Branch Tunnel project. Project Description: DC Water's Clean Rivers Project is planning a 4.2-million-gallon underground storage tunnel to capture sewage combined with stormwater, known as combined sewer overflow (CSO), that would otherwise overflow into Piney Branch and ultimately Rock Creek during heavy rains. This project will reduce overflow volume from CSO 049 by 96% in an average year when completed. Requested Scopes of Work include (but are not limited to): Temporary Facilities Supply, Job Site Photos, Field Engineering, Permit Coordinator, Community Outreach Coordinator, Environmental Manager, Maintenance of traffic, Fencing, Erosion & Sediment Control, Tree Removal, Aggregate Supply, Trucking & Hauling, Asphalt Paving, Curb & Gutter, Reinforced Concrete pipe supply, Precast storm Drain Manholes, Landscaping, Temporary Seeding, Earthwork, Site Utilities, Temporary Electrical Installation, Security, Noise and Pollution Control Consulting. Clark Construction Group, LLC is committed to assisting small, minority, and disadvantaged businesses by offering support with reduced scopes, scheduling facilitating construction equipment and bid preparation.

Sub-Bidding

Bridges / Tunnels

$250,000,000.00

Public - State/Provincial

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Execution and Closeout Requirements, Execution, Application
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Dewatering, Tunneling and Mining

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
85
Bidding Soon
1,940
All Active Projects
822
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2025

June 9, 2025

img_map_placeholder

To Be Determined, Washington, DC

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Early Work Package of the Piney Branch Tunnel Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.