EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 25, 2025 at 7:00 PM

Updated October 1, 2024

Demolition, site work, asbestos abatement and renovation of an educational facility in Lincoln Park, Michigan. Completed plans call for the demolition of a educational facility; for the renovation of a educational facility; for site work for a educational facility; and for asbestos abatement for a educational facility.

Removal of the 1st & 2nd Floor Level Ceiling/Flooring System to include Ceiling system and Flooring Removal Demolition in Corridors, Auditorium Wing Classrooms, Main Office, Main Office Mechanical Room, Auditorium Mechanical HVAC Demolition, Science Wing Classrooms, Tunnel Mechanical Demolition of HVAC Systems and any Thermal System Pipe Insulation Removal where present above ceilings and in Tunnel. 2024 Bond Prevailing Wages Are Required With Certified Payroll Statements With All Invoicing. The Contractors shall be made aware that Prevailing Wage Requirements shall be in effect for the classroom ceiling and flooring removal within the Auditorium classrooms, main office and Science rooms 120, 124, 126, 238, 240 and associated Closets and storage rooms. These areas are part of the new 2024 Bond. Therefore, All Work associated with these areas shall be submitted as Certified Payroll to the Lincoln Park Schools Business Office with your Invoices The remaining areas as stated below will not require prevailing wages. These areas are the remaining Mechanical related demolition/abatement within the Athletic Wing Tunnel K&L, All Mechanical in Auditorium Mezzanine, Media Center Mechanical Closet, Main Office Mechanical Room, Music Rooms Mechanical Closets(Music, Choir, Band Storage and IT Office Closets). BONDING WILL BE REQUIRED AS FOLLOWS: Bid Bond: 5% Performance Bond 100%, Labor & Material Bond 100%

GC Bidding

Educational

$600,000.00

Public - City

Asbestos Abatement, Demolition, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
107
Bidding Soon
1,460
All Active Projects
797
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2025

May 19, 2025

img_map_placeholder

1701 Champaign Rd, Lincoln Park, MI

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Asbestos Abatement/selective Interior Demolition High School Renovations

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.