Site work, paving and new construction of a mixed-use development in Watford City, North Dakota. Completed plans call for the construction of a pre-engineered storage facility; for site work for a pre-engineered storage facility; transportation facility; and for paving for a transportation facility.

The proposed work generally includes the following: Construct New 60’x45’ Snow Removal Equipment (SRE) Storage Building, New Concrete Apron and Access Road. Each bid shall be accompanied by a separate envelope containing a Bid Bond in a sum equal to five percent (5%) of the maximum bid price, executed by the Bidder as principal and by a surety company authorized to do business in the State of North Dakota, payable to the Watford City Municipal Airport Authority, conditioned that if the principal's bid be accepted and the contract awarded to him, he, within ten (10) days after Notice of Award has been executed, will execute and effect a contract in accordance with the terms of his bid and a contractor's bond as required by law and regulations and determinations of the governing board. The bid security of the two lowest bidders will be retained until the Notice of Award has been executed, but no longer than 60 calendar days. The bid security is a guarantee that the bidder will enter into contract for work described in the Proposal Timetables Goals for minority participation for each trade: 4.4% Goals for female participation in each trade: 6.9% The successful Bidder will be required to furnish a Contract Performance Bond and Payment Bond in the full amount of the Contract. The Watford City Municipal Airport Authority, Watford City, North Dakota, reserves the right to hold all bids for a period of 60 calendar days after the date fixed for the opening thereof to reject any and all bids and waive defects and to accept any bids should it be deemed for the public good and also reserves the right to reject the bid of any party who has been delinquent or unfaithful in the performance of any former contract to the Owner.

GC Bidding

Warehouse / Distribution - Pre-Engineered Storage Building

$1,400,000.00

Public - City

New Construction, Paving, Site Work

54

22

13

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Specialty Doors and Frames, Access Doors and Panels
Division 09 - Finishes

Division 09 - Finishes

Flooring, Carpeting
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Turning Vanes, Air Outlets and Inlets, Central Heating Equipment, Fuel-Fired Heaters, Heat Exchangers for HVAC, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Site Improvements, Retaining Walls, Planting, Planting Preparation, Soil Preparation, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Manufacturing Equipment, Dies and Molds, Molds, Mobile Plant Equipment, General Vehicles, Maintenance Vehicles
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
2
Bidding Soon
42
All Active Projects
22
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2025

May 14, 2025

img_map_placeholder

200 12th Street South East, Watford City, ND

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

New Snow Removal Equipment Building Construction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.