EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 1, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of a fire / police facility in Croton on Hudson, New York. Completed plans call for the renovation of a fire / police facility.

Reference Number 0000379884 The Village of Croton-on-Hudson (the "Village") wishes to develop a contract for the installation of the proposed Fire Suppression system for both the EMS addition at the Harmon Firehouse, as well as the existing Firehouse structure. The contractor will provide all materials and labor necessary in order to compete the work as described on the approved plans. While drawings for the entire addition are included in this bid packet, the contractor should only consider the Fire Suppression System installation work in their price. The contractor must also remove all existing ceiling tiles, safely store them on-site, and reinstall them once the work is done. All damaged ceiling tiles must be replaced by the contractor. Question Acceptance Deadline 04/01/2025 01:00 PM EDT Questions are submitted online Yes General Requirements - Bid Deposit Required - Certified Payroll - Insurance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % *he Village reserves the right to waive any informalities, reject any Bid that does not comply with the biding specifications or where the bidder is found to not be responsible. The Village is not obligated to accept any Bid and may reject all Bids if it is in the best interests of the Village.

Post-Bid

Fire / Police

$50,000.00

Public - City

Renovation

3

5

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping

Find More Local Projects

Within 75 Miles of This Project
517
Active Projects
332
Bidding Soon
5,103
All Active Projects
2,224
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

May 5, 2025

img_map_placeholder

30 Wayne St, Croton on Hudson, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Harmon Firehouse Addition - Fire Suppression System Installation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.