EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 11, 2025 at 8:00 PM

Updated October 1, 2024

Renovation and addition to an educational facility in Fayetteville, Georgia. Completed plans call for the renovation of a 249,908-square-foot educational facility; and for the addition of a 21,840-square-foot educational facility.

for Fayette County High School - Auxiliary Gymnasium Addition and Athletic Improvements, 1 Tiger Trail, Fayetteville, GA 30214, Fayette County, Georgia. At the time and place noted above, the proposals for the Project will be publicly opened and read. Contract, if awarded, will be on a lump sum basis. No bid may be withdrawn for a period of 60 days after time has been called on date of opening. Bids must be accompanied by a Bid Bond in an amount not less than 5% of the Base Bid. Both a Performance and a Payment Bond will be required in an amount equal to 100% of the Contract Price. The Owner reserves the right to reject any or all bids and to waive technicalities. The project involves the construction of a new approximately 16,000-square-foot auxiliary gym that includes a wrestling practice room and a weight room. Additionally, it features improvements to the field house and the construction of a new concessions building. Portions of the existing gym and portions of the field house will be partially demolished to accommodate the building additions. The auxiliary gym will include a full15 size basketball court with athletic wood flooring, a trainer’s room, and allow access from both floors of the existing gymnasium. The field house will include new coaches’ offices, new restrooms with showers, and new locker rooms. The concessions will be a new stand-alone building with restrooms for the visiting guests. Heating air and ventilation is provided primarily by gas fired roof-top units PN - 1022.2403

GC Bidding

Educational

$1,460,000.00

Public - County

Addition, Renovation

106

32

58

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
90
Bidding Soon
1,429
All Active Projects
640
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2025

April 28, 2025

img_map_placeholder

1 Tiger Trail, Fayetteville, GA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Fayette County High School - Auxiliary Gymnasium Addition and Athletic Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.