EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 12, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of a detention facility in Gatesville, Texas. Completed plans call for the renovation of a detention facility.

March 4, 2025, at 5:00 p.m. Estimated Date to Issue Amendment for Questions All communications and questions concerning this Solicitation, including any of a technical nature, shall be made in writing to: PRIMARY CONTACT Texas Department of Criminal Justice Contracts and Procurement Department Construction, Utilities & Environmental Branch Macey Hogge Contract Specialist III Two Financial Plaza, Suite 703 Huntsville, Texas 77340 Email: Macey.Hogge@tdcj.texas.gov, SECONDARY CONTACT Kristy Luna, Contract Specialist I Email: Kristy.Luna@tdcj.texas.gov The Contract Specialist shall be the primary point of contact and is responsible for the administration of all matters concerning the Historically Underutilized Business (HUB) program, bonds, insurance, disputes, claims, and all Change Orders estimated at $25,000.00 or more. The performance period for this Contract shall be 425 Days and shall begin on the date designated in the Notice to Proceed. All Work shall be completed within the number of Days designated in the Notice to Proceed, unless otherwise modified by written agreement of the contracting parties. The Contractor shall begin mobilization within 30 days of receipt of the Notice to Proceed, and work shall commence within 45 days of receipt of the Notice to Proceed. If the Contractor fails to complete the Work within the time specified in the Contract, or any extension, the Contractor shall pay to the TDCJ as liquidated damages, the sum of $470.00 for each available Day of delay. The TDCJ is seeking proposals to install a new fire alarm system complete with fire alarm control panels, annunciators, smoke detectors, duct detectors, relays, horns/strobes, conduit boxes, wire and other electrical components required to comply with the NFPA Life Safety Codes in multiple buildings.

Sub-Bidding

Jails / Prisons

$200,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

15

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 05 - Metals

Division 05 - Metals

Metal Decking
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceilings, Painting and Coating
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Identification for Electrical Systems, Overcurrent Protective Device Coordination Study, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Grading, Excavation and Fill, Dewatering, Fill, Backfill, Compaction, Embankments, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
20
Bidding Soon
888
All Active Projects
369
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2025

April 16, 2025

img_map_placeholder

2305 Ransom Rd, Gatesville, TX

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

O'Daniel Unit: Install New Fire Alarm System

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.