EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 6, 2025 at 8:00 PM

Updated June 7, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Ellettsville, Indiana. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

Project Control No. 1900098, 2000311 3.00 percent of the contract bid price for the IVOSB goal Federal/state No. 1900098, 2000311 Location Replace Superstructure 046-53-08552 Continuous Reinforced Concrete Slab Monroe County - on Sr 46w Over Jacks Defeat Creek, 6.04 Miles West of Sr 37 (Rp 047+0026) Bridge Deck Overlay 046-53-07170 Continuous Reinforced Concrete Slab Monroe County - on Sr 46e Over Jacks Defeat Creek, 4.83 Miles West of Sr 37 (Rp 047+0010) Mbe Goal: 7.00 Wbe Goal: 5.00 Ivosb Goal: 3.00 Completion Date October 31, 2026 Qualifications: D(A) 0250 All Bidders Must Be Prequalified and Have Proper Qualifications and Bidding Capacity. An Executed Bid Bond Shall Be Included With All Bids. Only Electronic Bid Bonds Submitted Through the Designated Electronic Medium, Either Surety2000 or Tinubu Surety Solution, Will Be Accepted With the Bid. A Fully Executed Performance Bond Shall Be Included With All Bids, Except on Contracts for Roadside Mowing, Vegetation Control, Demolition, Landscaping, Fencing, Seeding and Sodding, Bridge Painting, and Guardrail Installations of $100,000 or Less, When the Bidder May Elect Not to Furnish a Performance Bond. Electronically Does Not Support Submittal of the Performance Bond. The Performance Bond Must Be Submitted to the Construction Letting Email Inbox or Be Delivered on Paper by the Time Set for Receipt of Proposal Bids. Each Contractor That Submits a Proposal Bid in the Amount of $150,000 or More for Highway Improvements Described in This Notice is Required to Submit With That Bid a Written Plan for a Program to Test the Contractor's Employees for Drugs. The Plan Shall Be in Compliance With Indiana Code 4-13-18. The Plan Must Be Submitted to the Construction Letting Email Inbox or Deposited With the Indot Engineer by the Time Set for Receipt of Proposal Bids. INDOT - Call 225 - Replace Superstructure and Bridge Deck Overlay - SR 46

Award

Bridges / Tunnels

$4,050,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

162

10

2

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Temporary Access Roads, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Bentonite Waterproofing, Joint Protection, Joint Sealants, Expansion Control
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Resilient Flooring, Painting and Coating, Painting
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Mercantile and Service Equipment, Collection and Disposal Equipment, Solid Waste Handling Equipment, Recycling Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets, Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Dumbwaiters
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Geosynthetics for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Shotcrete Soil Slope Stabilization, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Retaining Walls, Planting, Planting Preparation, Mulching, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers, Manufacturing Equipment, Machining Equipment, Drilling Equipment, Sawing Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
39
Bidding Soon
989
All Active Projects
406
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2025

July 7, 2025

img_map_placeholder

State Rd 46, Ellettsville, IN

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Replace Superstructure and Bridge Deck Overlay - SR 46

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.