EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 13, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Morris, New York. Completed plans call for the renovation of a educational facility.

The Morris Central School District (Owner), invites the submission of Sealed Bid Proposals to furnish materials and labor to complete the Alterations to: Main K - 12 Building and Custodial Maintenance Building Project No. 2021-135 Ph2 all in accordance with the plans and specifications. This work is to be bid under a MULTIPLE CONTRACT system covering the work of all trades under separate contracts as follows: Contract No. 4 - Electrical Construction Any bid may be withdrawn without prejudice prior to the official bid submission time or any publicized postponement thereof. Complete digital sets of Bidding Documents, drawings and specifications, may be obtained online. Bidders wishing documents mailed to them shall include, in addition to the document deposit, a non-refundable check of $15.00 per set for handling and postage or a UPS/FedEx account number. Please note REVplans is the designated location and means for distributing and obtaining all bid package information. The Provider takes no responsibility for the completeness of Contract Documents obtained from other sources. Contract Documents obtained from other sources may not be accurate or may not contain addenda that may have been issued All bid addenda will be transmitted to registered plan holders via email and will be available at online. Plan holders who have paid for hard copies of the bid documents will need to make the determination if hard copies of the addenda are required for their use and coordinate directly with the printer for hard copies of addenda to be issued. There will be no charge for registered plan holders to obtain hard copies of the bid addenda. The Bid Documents and Contract Documents may also be examined at the office of BCA Architects & Engineers, 31 Lewis Street, Suite 402, Binghamton, New York 13901. PLANS AND SPECIFICATIONS REMAIN THE PROPERTY OF BCA Architects & Engineers AND MUST BE RETURNED IN GOOD CONDITION WITHIN THIRTY (30) BUSINESS DAYS AFTER AWARD OF CONTRACT OR REJECTION OF BIDS. The plan deposit for one set of Plans and Specifications will be refunded to bona fide bidders returning Plans and Specifications to REVplans within 30 business days after award of Contract or rejection of bids. A partial refund of the plan deposit, in an amount equal to the full amount of such deposit, less the actual cost of reproduction of the Plans and Specifications shall be made to non-bidders and unsuccessful bidders for the return of all other copies of the Plans and Specifications in good condition within 30 business days following the award of the Contract or the rejection of the bids. Plan Deposit Policy, Plan Holders List, Pre-Bid Estimates, and a list of Addendums, if any, may be found at online. Bids shall be prepared as set forth in the Information to Bidders, enclosed in a sealed envelope bearing on its face the name, address and phone number of the bidder and the title of the project. Each bidder agrees to waive any claim it has or may have against the Owner, the Architect/Engineer, and the respective employees, arising out of or in connection with the administration, evaluation or recommendation of any bid. The Owner further reserves its right to disqualify bidders for any material failure to comply with the Information for Bidders and General, Supplementary, and Special Conditions. The Owner reserves the right to reject any or all bids and to waive any informalities or defects in such bid either before or after opening. Each bidder must deposit with his bid, security in the form and subject to the conditions provided in the "INFORMATION FOR BIDDERS". Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and to the minimum wage rates to be paid under the Contract. No bidder may withdraw his bid within 45 business days after the date of the opening of bids. ATTENTION OUT-OF-STATE BIDDERS Please pay particular attention to the Form of Proposal and it related forms in the project manual. Out-of-State Bidders are required to complete the "Statement Concerning Authority to do Business in the State of New York for non-New York State Companies" located in the Form of Proposal package. There are three sections that must be completed. You must also have the Non-Collusion Certificate completed and signed and if you are a corporation, you must have the Resolution completed and signed. No bid will be considered when opened unless accompanied by a certified copy of your Authority to do Business in New York State. This is not to be confused with a sales tax certificate. The Authority can be obtained by contacting: New York State Department of State Division of Corporations 162 Washington Avenue Albany, NY 12231 (518) 473-2492 If the Certificate does not accompany the bid, the bid is not valid. In the event you are of the opinion that you are not required to obtain the Authority To Do Business in New York state, and you are not a New York State Corporation, then you should complete the Statement Concerning Authority to do Business. You must complete two out of three sections. The top portion must be completed by all vendors needing to complete this document and then either the Individual Acknowledgement or the Corporate Acknowledgement, depending on the status of your business.

Post-Bid

Educational

$35,000.00

Public - City

Renovation

15

16

18

6

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Haul Routes, Temporary Parking Areas, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Existing Conditions, Facility Remediation, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Specialty Placed Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Roofing and Siding Panels, Siding
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Ceilings, Wall Finishes, Wall Coverings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Entertainment Equipment, Play Field Equipment and Structures, Playground Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Electrical and Cathodic Protection, Facility Lightning Protection, Lightning Protection for Structures, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Retaining Walls, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Manufacturing Equipment, Dies and Molds, Dies, Molds

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
101
Bidding Soon
1,385
All Active Projects
610
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2025

April 23, 2025

img_map_placeholder

65 W Main St, Morris, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Alterations to Main K - 12 Building and Custodial Maintenance Building - Contract No. 4 Electrical Construction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.