EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 27, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a power facility in Wright Patterson AFB, Ohio. Completed plans call for site work for a power facility.

UPDATE 17 MARCH 2025 - AMENDMENT 1 TO COMBO-AFRL-PZLEQ-2025-0100 (See Attached) This is a combined synopsis/solicitation for the RQ Building 65 Unit Substation Updates issued by the Air Force Research Laboratory, Wright-Patterson AFB, Ohio Place of Performance: Wright-Patterson AFB, Ohio Project: B65 Unit Substations The contractor shall replace the fan controller, 2x bolt on bus large breakers, 1x bolt on buss medium breaker, and 8x stab on breakers of various sizes in Substation 14. The contractor shall provide and install a new switchboard to replace Substation 12 main gear, Substation 12 480V distribution gear, Panel P, and Panel A4 in 115E. The contractor shall provide a new 2000A Feed to the new switchboard in Section 3.2 from an existing breaker in Substation 11. The contractor shall provide and install a new panelboard to replace existing 240V section of Substation 12 distribution gear in 115E. The contractor shall provide and install 2 new panelboards to replace Panel H, these new panelboards will be relocated within M103E, and all new feeds will be provided to branch circuits. The contractor shall provide and install a new panelboard to replace existing 480V PDP 480 TFE on the Test Floor, relocate an existing 480V panelboard, and provide and install a new 75KVA 480Y to 208Y transformer that will feed 2x 100A 208/120V Panelboards. The contractor shall provide and install a new panelboard to replace existing 480V PDP 480 1EW 2 in the East Warehouse. The contractor shall demolish existing gear that is no longer required in and around the locations of the new panels identified in Sections 3.2-3.7. The period of performance for this work is 18 months from time of award.

Post-Bid

Power Plant

$5,000,000.00

Public - Federal

Site Work

9

9

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Bonds
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
82
Bidding Soon
1,356
All Active Projects
554
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2025

June 4, 2025

img_map_placeholder

To Be Determined, Wright Patterson AFB, OH

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RQ Building 65 Unit Substation Updates

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.