EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 27, 2025 at 7:00 PM

Updated October 1, 2024

Site work and paving for a bridge / tunnel in Savannah, Missouri. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

We propose to perform the work described below, and as outlined in the Specifications and Drawings, for the price as indicated. We will comply with governmental regulations including prevailing wage rates. Our Bid Bond or Cashier's Check in the amount of 5% of our bid is attached hereto. On acceptance of our bid, we will furnish the County with a Performance Bond, certificates of Liability and Property Damage Insurance in the amount of $500,000.00 and proof of Workman's Compensation Insurance in accordance with statutory limits. Prior to final payment, we will furnish the County certificates that there are no liens for material or labor used in the work, and that the prescribed prevailing wage rates in this area have been paid to all workers. Specifically, we propose to provide equipment, labor and material, not specifically provided by the County or others, required to perform all work for LAYING OUT BRIDGE H-PILE, DRIVING H-PILE, DRIVING SHEET PILING, CONSTRUCTING CHANNEL CAP, SETTING BEAMS, WELDING END CHANNELS, WELDING CHANNELS ON TOP OF SHEET PILE and INSTALLING DIAPHRAMS, for the total lump sum indicated below. The bridge shall be completed within sixty (60) calendar days after execution of the contract by the County. Delays caused by inclement weather or unworkable conditions at the site will be considered in enforcement of this requirement. Should the Contractor not pursue the work with due diligence, the ANDREW COUNTY COMMISSION shall have the right to deduct $500.00 per calendar day, for each calendar day after the agreed scheduled completion, as liquidated damages. The County will have the existing bridge removed and the excavation done for the abutment piles to be driven. The Contractor will be responsible for the layout of the new piles and driving them to practical refusal as per AASHTO Section 4 Division 2 and inspected by the engineer.

GC Bidding

Bridges / Tunnels

$455,000.00

Public - County

Paving, Site Work

7

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
42
Bidding Soon
610
All Active Projects
272
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2025

April 28, 2025

img_map_placeholder

To Be Determined, Savannah, MO

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Construction of H-Pile Abutments, Sheet Piling, and Setting of Bridge Beams Bridge 235005

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.