Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 21, 2025 at 8:00 PM
Updated October 1, 2024
Site work and paving for a mixed-use development in Normal, Illinois. Completed plans call for site work for a educational facility; for paving for a educational facility; sidewalk / parking lot; and sidewalk / parking lot.
Contractors shall provide all labor, equipment, and materials for the Illinois State University Bone Student Center Parking Lot project. This project will have multiple prime contracts including a General Construction Contract and an Electrical Contract. Work to include but is not limited to the removal and replacement of existing asphalt and concrete in the parking areas, drop off areas, modified parking entrances, landscaping and pedestrian paving updates, lighting replacement, restriping, addition of new parking controls and all associated data and electrical work, and new vehicle entrance including canopies and pre-fabricated booth. Refer to Division 01 for the technical specifications for a complete, detailed breakdown of the contractor specific base bids for this project. Initial parking lot completion for owner operation shall be by August 8, 2025. Substantial project completion shall be subsequently scheduled for October 30, 2025. General Construction Contract Scope of Work: Work of the General Construction Contract includes, but is not limited to, the following: Work identified as inclusive of the General Construction Contract, remaining work not identified as work under other contracts, selective site demolition and earthwork. Site improvements including roadways, parking lots and pedestrian paving, site development furnishings and equipment, and landscaping. Miscellaneous items, including installation of metal panels, PV, parking controls or as otherwise shown in the drawings. Owner furnished, contractor installed related items. Contractors will be responsible to coordinate lead times of all materials and the overall project schedule to complete the project on time. Any additional costs to expedite materials or source alternate/substitutions will be borne by the contractor. Also see the temporary facilities controls listed in the technical specification for the General Construction Contract. There is a 9% BEP goal for the General Prime and an 11% BEP goal for the Electrical Prime for this procurement. Separate University-supplied NIGP commodity code lists have also been provided for each prime. See solicitation documents for details. More information regarding the BEP goals will be shared during the pre-bid meeting. For instructions on how to obtain a comprehensive purchase description, disclosure or contract forms, contact: Mary Kate Schopp 100 S Fell Ave, Ste D CampusBox 1220 Normal, Il 61970-1220 Purchasing Website
Post-Bid
Sidewalks / Parking Lot
$230,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 25, 2025
April 21, 2025

200 N University St, Normal, IL
Related To This Project
Normal, IL
Bid Date: Mar 19 2025
Normal, IL
Bid Date: Mar 19 2025
Normal, IL
Bid Date: Mar 20 2025
Normal, IL
Bid Date: Apr 07 2025
Normal, IL
Bid Date: Mar 27 2025
Normal, IL
Bid Date: Apr 02 2025
Normal, IL
Bid Date: Apr 04 2025
Normal, IL
Bid Date: Apr 02 2025
Normal, IL
Bid Date: Feb 20 2025
Normal, IL
Bid Date: Feb 21 2025
Normal, IL
Bid Date: Feb 25 2025
Normal, IL
Bid Date: Feb 13 2025
Normal, IL
Bid Date: Feb 13 2025
Normal, IL
Bid Date: Feb 21 2025
Normal, IL
Bid Date: Mar 07 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.