EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 15, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of a municipal facility in Orlando, Florida. Completed plans call for the renovation of a municipal facility.

Timely questions concerning this solicitation shall be submitted in accordance with the deadline for questions: Monday, March 17, 2025 at 5:00 pm EST. Respondents are instructed not to contact the initiating division directly. Untimely questions are unable to be submitted in the question and answer module, thereafter respondents raising critical concerns must email julianne.foyil@ocfl.net. Critical clarifications may be made via addenda, however, untimely questions may not be considered. Consideration for modification or alteration of the documents contained in this solicitation shall be requested during the specified question period, before the applicable deadline. No oral interpretation of the meaning of the plans, specifications, or other Contract documents shall be considered binding. The County shall be bound by information and statements only when such statements are written and executed under the authority of the Manager, Procurement Division. The Orange County Procurement Division operates under the leadership of Carrie Mathes, MPA, NIGP-CPP, CFCM, CPPO, CPPB as Procurement Division Manager and Chief Procurement Official in accordance with the Orange County Ordinance. A bid shall constitute an irrevocable offer for a period of one hundred twenty (120) days from the public opening date or until the date of award. In the event that an award is not made by the County within one hundred twenty (120) days from the public opening date, the respondent may withdraw their offer or provide a written extension without modification. Panel 2A is a new panel basics of design is square D. See addendum # 2 with revised sheet E601 with panel schedule. Electrical drawings show all mechanical equipment being replaced disconnect shall be a motor rated switch. Refer to feeder schedule for ampacity of the switch Contractor to review all discipline of the drawings. Drawings show all equipment being replaced. Contractor needs to review all pages of drawings not just E601.

Post-Bid

Municipal

$700,000.00

Public - County

Renovation

47

19

30

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Commissioning, General Commissioning Requirements
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Flooring, Wood Flooring, Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Dampers
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Low-Voltage Distribution Equipment, Wiring Devices, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill
Division 33 - Utilities

Division 33 - Utilities

Communications Utilities, Communications Distribution

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
93
Bidding Soon
1,705
All Active Projects
682
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2025

May 22, 2025

img_map_placeholder

450 E South St, Orlando, FL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Internal Operations Center Complex Heating 1 & 2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.