Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 13, 2025 at 8:00 PM
Updated October 1, 2024
Site work and renovation of a mixed-use development in Crown Point, Indiana. Completed plans call for the renovation of a power facility; for site work for a power facility; power facility; and power facility.
Project includes the installation per design of solar photovoltaic (PV) panels, racking, inverters, fencing, and electrical connective equipment on the ground of the Lake County Government Center Utilities. Install AC panel boxes for collecting the AC power from the inverters and distribute to the electrical service. Install connective equipment from the AC panels to the utility grid per utility s direction. Work includes all materials required to ground mount 1968 - 590Wdc solar panels, connect to 16 inverters, connect to AC collector/distribution panel, and interconnect to the service side of the new, utility transformer at 277/480V (3-phase, Delta-grounded WYE). Each bidder shall accompany his proposal with the proper bid security made payable to the Board of Commissioners of Lake County as follows: Any person, firm or corporation who submits a proposal and has a principal place of business in the State of Indiana MUST submit a BOND in the amount of five percent (5%) of their total bid. Any person, firm or corporation who submits a bid and DOES NOT have a principal place of business in the State of Indiana MUST file with their bid a CERTIFIED CHECK BANK DRAFT, CASHIER S CHECK or MONEY ORDER issued by a financial institution by an agency of the United States in the amount of five percent (5.0%) of their bid, made payable to the Board of Commissioners of Lake County. The successful Bidder will be required to carry Workmen s Compensation, Employee s Liability Insurance and Comprehensive Public Liability and Property Damage Insurance in amounts and with companies satisfactory to the owner. In addition, the contractor shall furnish Performance and Payment Bonds for 100% of the Contract Sum. Executive Summary of Goals. 1) Employment - The contractor shall have a goal of Thirty-Four (34%) Percent of minority work force participation (as a percentage ofthe total number of employees or the total number of hours worked on the project, whichever is greater) and 6.9% for work force participation by women (as a percentage of the total number of employees or the total number of hours worked on the project, whichever is greater), if available. Subcontractors and Suppliers- A goal ofThirteen (13%) Percent forMBE participation and Two (2%) Percent for WBE participation (as a percentage of the total contract amount) is hereby set for the project. The Owner reserves the right to accept or reject any Bid and to waive any irregularities in the bidding. All bids may be held for a period not to exceed 120 days, or as otherwise stated in the Contract Documents before awarding the contract.
Post-Bid
Solar Power Generation
$300,000.00
Public - County
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 03 - Concrete
Division 04 - Masonry
Division 09 - Finishes
Division 10 - Specialties
Division 26 - Electrical
Division 31 - Earthwork
Division 34 - Transportation
Division 48 - Electrical Power Generation
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 16, 2025
May 16, 2025

2293 N Main St, Crown Point, IN
Related To This Project
Crown Point, IN
Bid Date: Apr 17 2025
Crown Point, IN
Bid Date: Apr 03 2025
Crown Point, IN
Bid Date: May 07 2025
Crown Point, IN
Bid Date: May 21 2025
Crown Point, IN
Bid Date: Jun 18 2025
Crown Point, IN
Bid Date: May 21 2025
Crown Point, IN
Bid Date: May 19 2025
Crown Point, IN
Bid Date: Jun 18 2025
Crown Point, IN
Bid Date: Mar 13 2025
Crown Point, IN
Bid Date: Mar 21 2025
Crown Point, IN
Bid Date: Mar 31 2025
Crown Point, IN
Bid Date: Apr 14 2025
Crown Point, IN
--
Crown Point, IN
Bid Date: Feb 12 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.