EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 13, 2025 at 8:00 PM

Updated October 1, 2024

Site work and renovation of a mixed-use development in Crown Point, Indiana. Completed plans call for the renovation of a power facility; for site work for a power facility; power facility; and power facility.

Project includes the installation per design of solar photovoltaic (PV) panels, racking, inverters, fencing, and electrical connective equipment on the ground of the Lake County Government Center Utilities. Install AC panel boxes for collecting the AC power from the inverters and distribute to the electrical service. Install connective equipment from the AC panels to the utility grid per utility s direction. Work includes all materials required to ground mount 1968 - 590Wdc solar panels, connect to 16 inverters, connect to AC collector/distribution panel, and interconnect to the service side of the new, utility transformer at 277/480V (3-phase, Delta-grounded WYE). Each bidder shall accompany his proposal with the proper bid security made payable to the Board of Commissioners of Lake County as follows: Any person, firm or corporation who submits a proposal and has a principal place of business in the State of Indiana MUST submit a BOND in the amount of five percent (5%) of their total bid. Any person, firm or corporation who submits a bid and DOES NOT have a principal place of business in the State of Indiana MUST file with their bid a CERTIFIED CHECK BANK DRAFT, CASHIER S CHECK or MONEY ORDER issued by a financial institution by an agency of the United States in the amount of five percent (5.0%) of their bid, made payable to the Board of Commissioners of Lake County. The successful Bidder will be required to carry Workmen s Compensation, Employee s Liability Insurance and Comprehensive Public Liability and Property Damage Insurance in amounts and with companies satisfactory to the owner. In addition, the contractor shall furnish Performance and Payment Bonds for 100% of the Contract Sum. Executive Summary of Goals. 1) Employment - The contractor shall have a goal of Thirty-Four (34%) Percent of minority work force participation (as a percentage ofthe total number of employees or the total number of hours worked on the project, whichever is greater) and 6.9% for work force participation by women (as a percentage of the total number of employees or the total number of hours worked on the project, whichever is greater), if available. Subcontractors and Suppliers- A goal ofThirteen (13%) Percent forMBE participation and Two (2%) Percent for WBE participation (as a percentage of the total contract amount) is hereby set for the project. The Owner reserves the right to accept or reject any Bid and to waive any irregularities in the bidding. All bids may be held for a period not to exceed 120 days, or as otherwise stated in the Contract Documents before awarding the contract.

Post-Bid

Solar Power Generation

$300,000.00

Public - County

Renovation, Site Work

41

8

14

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Interior Specialties, Partitions
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Power Filters and Conditioners, Capacitors, Lighting, Exterior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation Equipment, Solar Energy Electrical Power Generation Equipment, Wind Energy Electrical Power Generation Equipment

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
105
Bidding Soon
2,119
All Active Projects
905
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2025

May 16, 2025

img_map_placeholder

2293 N Main St, Crown Point, IN


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Solar Array Equipment and Installation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.