EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 5, 2025 at 7:00 PM

Updated October 1, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Owego, New York. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The time for performance of contract is 200 days from date of Notice to Proceed and completed and ready for final payment by December 15 2025. The Disadvantaged Business Enterprise (DBE) Utilization Goal is 6%. The Equal Employment Opportunity goal for Minority Participation is 1.1% and the Women Participation goal is 6.9%. There are no M/WBE/SDVOB requirements or preferences contained in this contract.| A certified check or cashier's check payable to Tioga County or a satisfactory Bid Bond executed by the Bidder and an acceptable surety, in an amount equal to five percent (5%) of the total Bid shall be submitted with each Bid. The Successful Bidder shall be required to furnish and pay for satisfactory Performance and Labor and Material Payment Bonds, each in the amount at least equal to the Contract Amount as security for the faithful performance and payment of all Contractor's obligations under the Contract Documents. The successful bidder and subcontractors must have an approved "New York State Uniform Contracting Questionnaire for Profit Construction" (CCA-2 Form) on file with NYSDOT prior to an award being made. Tioga County reserves the right to waive any informality in, or to reject any or all Bids. Bids may be held by Tioga County for a period not to exceed forty-five (45) calendar days from the date of the Bid Opening for the purpose of reviewing the Bids and investigating qualifications of Bidders prior to awarding the Contract. Bidders are required to promptly notify contacts in this notice of any errors, omissions, conflicts or ambiguity among contract documents. Addenda to bid documents will be sent to registered plan holders via email. This is a federal-aid contract subject to the approval of the Federal Highway Administration (FHWA) and the New York State Department of Transportation (NYSDOT). Whenever local and/or New York State requirements differ from Federal requirements, the Federal requirements will prevail unless state and local requirements are deemed to be more stringent. There are no residence, geographical restrictions, or preferences contained in this contract. The NYSDOT Standard Specifications (January 1, 2025), as amended, govern work performed under this contract. NON-COLLUSIVE BIDDING CERTIFICATION, OFFERER DISCLOSURE OF PRIOR NONRESPONSIBILITY DETERMINATIONS, COMBINED CERTIFICATION FORM, BID BOND, BID PROPOSAL, PROPOSAL FORM WITH BID AND SIGNATURE, AND BID TABULATION SHEETS, MUST BE SUBMITTED WITH EACH SIGNED PROPOSAL. Technical questions shall be directed no later than 3 working days prior to bid opening to: Delta Engineers, Architects, Land Surveyors & Landscape Architects, DPC Brian Tyler, PE - Project Manager

Post-Bid

Bridges / Tunnels

$1,600,000.00

Public - County

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
80
Bidding Soon
1,064
All Active Projects
415
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2025

May 26, 2025

img_map_placeholder

Harnick Rd, Owego, NY

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Harnick Road Bridge Replacement over Apalachin Creek

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.