EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 3, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a transportation facility in Goldsboro, North Carolina. Completed plans call for site work for a transportation facility.

The project will consist of airfield storm drainage improvements to include ditch grading, replacement of existing drainage pipes and structures, and installation of new drainage pipes and structures. The project includes approximately 15,000 cubic yards of unclassified excavation and approximately 2,500 cubic yards of embankment in place, It is anticipated that the contract award will be made to the lowest responsive and responsible bidder if an award is made, All Contractors are hereby notified that they must have proper licenses under the state law for their trades. General Contractors are notified that applicable statues of North Carolina will be observed in receiving and awarding general contracts. Each proposal shall be accompanied by a cash deposit or a certified check drawn on a bank or trust company insured by the Federal Deposit Insurance Corporation in an amount equal to not less than 5% of the proposal or a bid bond of 5% of the bid executed by a surety company licensed under the laws of North Carolina to execute such bonds. The deposits shall be made payable to the Owner and shall be retained by the Owner as liquidated damages in the event of the successful bidder fails to properly execute the contract within ten (10) days after award and to give satisfactory surety as required by law. By submitting a bid the Contractor certifies that he has under his direct control or at his disposal the men, equipment, and materials required to execute this work as specified. Lack of such control or availability of men, equipment or materials shall constitute failure to properly execute the Contract. Performance and Labor and Material Payment Bonds will be required for 100% of the Contract price, with a surety or sureties legally authorized to do business in the State of North Carolina. A bid may be withdrawn only as provided by the applicable statues of North Carolina. If a bid is withdrawn within 90 days of the bid opening, the Bid Guarantee shall be forfeited; provided that, if the request to withdraw is made not later than 72 hours after the opening of bids, and if the withdrawal is allowed, the Owner may return the bid guarantee. NON-DISCRIMINATION CLAUSE: The Special Provisions (SP1 G61) of the North Carolina Department of Transportation, apply to this contract. It is the policy of Wayne County to practice nondiscrimination based on race, color, sex, or national origin in the award or performance of this contract. All firms qualifying under this solicitation are encouraged to submit bids/proposals. Award of this contract will be conditioned upon satisfying the requirements of this bid specification. These requirements apply to all bidders/offerors, including those who qualify as DBE. A DBE contract goal of two percent (2.0%) has been established for this contract. The bidder/offeror shall make good faith efforts, as defined in SPIG61 to meet the contract goal by utilizing DBE's in the performance of this contract. The apparent successful bidder will be required to submit in the "Proposal" section of his bid the information concerning the DBE(s) that will participate in this contract. This information will include: (1) the names, addresses and telephone numbers of DBE firms that will participate in the contract, and the certifying agency documentation of current status as a bona fide DBE; (2) a description of the work that each DBE firm will perform; (3) the dollar amount of the participation of each DBE firm participating (4) written documentation of the bidder/offeror's commitment to use a DBE subcontractor whose participation it submits to meet the contract goal; and (5) written confirmation from the DBE that is participating in the contract as provided in the commitment made under (4). If the bidder fails to achieve the contract goal stated herein, he will be required to provide documentation demonstrating that he made a good faith effort. The bidder's documentation shall be submitted in accordance with the provisions of SPIG61. The Owner reserves the right to reject any or all bids and to waive informalities and minor irregularities.

Bid Results

Transportation Terminals

$1,812,105.00

Public - County

Site Work

37

11

5

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Planting Preparation, Soil Preparation, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Mobile Plant Equipment, General Vehicles, Maintenance Vehicles
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
81
Bidding Soon
1,127
All Active Projects
530
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

June 2, 2025

img_map_placeholder

To Be Determined, Goldsboro, NC


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Airfield Drainage Improvements (Phase 2)

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.