Published April 21, 2025 at 8:00 PM

Updated October 1, 2024

Site work and new construction of a playground / park / athletic field in Woonsocket, Rhode Island. Completed plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.

Reference Number : 0000379103 Provide the construction of a new stand alone Concession building as part of the new Athletic Facility located in Cass Park The work generally includes, but is not limited to the following: To provide a new concession building for the City of Woonsocket the Cass Park Athletic Complex at 350 Cumberland Hill Road, Woonsocket, RI 02895. Project Timeline: The project must be completed in its entirety no later than September 1, 2025. Question Deadline 04/09/2025 at 4:30 PM ET are submitted online : No . Job : 350 Cumberland Hill Rd., Woonsocket, RI 02895 General Requirements - Bid Deposit Required - Contractors License Required - FOB Destination - Installation Required - Insurance Required - License Required - Prevailing Wage Required - Bid 5 - 100 - 100 Withdrawal of Bids: No bidder may withdraw their bid within sixty (60) after the actual time and date of the bid opening thereof. Rejection of Bids: The City reserves the right to cancel this ITB, award on the basis of cost alone, accept or reject any or all bids, in whole or in part. The City further reserves the right to waive as an informality any irregularities contained in any bid not affecting substantial rights that may be in the City's best interest. Bids found to be technically or substantially nonresponsive at any point in the review process will be rejected and not considered further. Any such decision will be considered final. Bid Award: Upon selection of a winning contractor, the City of Woonsocket will send a bid award notice to the awardee. The bid award notice will identify a point of contact from the City who will assist the awardee in completing any pre-work requirements. Upon satisfactory meeting all of the obligations of the pre-wok requirements, the City of Woonsocket will issue a "Notice to Proceed" for work to commence. ** Bid date info : Bids received after the deadline will not be accepted and will be returned unopened to the sender. Bid Submissions: Bids may be prepared and submitted electronically or physically. Electronic submissions must follow the online instructions. Physical submissions must use the provided bid forms. All written forms must be either typed or legibly printed, then signed and dated in blue or black ink. Physical bids must be submitted in duplicate, placed in a sealed envelope and identified with the following information: "Cass Park Concession Building, Bid No. 6308" including the name of the company submitting the bid. (Sealed Bid Label Form is attached for your use):

Post-Bid

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - City

New Construction, Site Work

25

22

9

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Precast Concrete, Site-Cast Concrete, Tilt-Up Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Rough Carpentry, Sheathing, Finish Carpentry, Architectural Woodwork, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Exterior Insulation and Finish Systems, Roofing and Siding Panels, Metal Roof Panels, Flashing and Sheet Metal, Flexible Flashing, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Flooring, Wood Flooring, Resilient Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Furnishing Accessories, Waste Receptacles, Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
395
Active Projects
233
Bidding Soon
3,241
All Active Projects
1,528
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2025

April 28, 2025

img_map_placeholder

350 Cumberland Hill Rd, Woonsocket, RI

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Cass Park Concession Building

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.