Published March 13, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Montgomery, New York. Completed plans call for the renovation of a educational facility.

No. 2 - Plumbing Construction (PC) Valley Central High School - Replace Gymnasium Divider Walls with New Divider Wall. Valley Central Middle School - Replace Gymnasium & Cafeteria Divider Walls with Manual Curtains, Exterior Door Replacements, Pool Boiler Replacements, Pool Skylight Replacements, Pool Filtration System Replacements, and Pool Deck Re-Grouting. Berea Elementary School - Replace Gymnasium Divider Walls with Manual Curtains, Exterior Door Replacements, and Water Softener System Replacements. East Coldenham Elementary School - Replace Gymnasium Divider Walls with Manual Curtains and Exterior Door Replacements. Montgomery Elementary School - Replace Gymnasium Divider Walls with Manual Curtains, Replacement of Slate Roofing with New Synthetic Slate, and Restoration of Central Roof Tower. Walden Elementary School - Exterior Door Replacements. Maybrook Alternative Learning Center - Exterior Door Replacements. The Owner, the Valley Central School District will recieve sealed bids to furnish material and labor to complete the 2024 Capital Improvement Project which includes alterations. Each bid shall be on a stipulated sum basis for the following contracts CONTRACTS Bidder must provide Bid Security in the amount and form, per the terms indicated in Section Instructions to Bidders. All Bids will remain subject to acceptance for forty-five (45) days following the receipt of Bids. The Owner may, in its sole discretion, reject any Bid and return Bid Security prior to that date. Bids shall not include New York State sales and compensating use taxes on materials and supplies incorporated into the Work, as the Owner being exempt therefrom. Bidders must comply with New York Sate Department of Labor Prevailing Wage Rate Schedule and conditions of employment. his project is publicly funded. The Bidders must comply with New York State Department of Labor Prevailing Wage Rate Schedule and conditions of employment. The Valley Central School District reserves the right to waive any informalities or irregularities in the Bids received, and/ or to reject all Bids without explanation. ** pre bid info : Walkthroughs will commence after the Pre-Bid Conference at Valley Central Middle School, Valley Central High School, East Coldenham Elementary School, Berea Elementary School, Montgomery Elementary School, Maybrook Alternative Learning Center, and Walden Elementary School. Attendance of this meeting is recommended as the Owner, Architect and/or consultants will be present to discuss the Project. Attendees should anticipate 30 minutes Q & A session. ** bid doc info : Bidding/Contract Documents (drawings and project manuals) may be examined as of 02-28-2025 at the following locations: CSArch Address: 19 Front Street Newburgh, New York 12550 845-561-3179 , Note: By appointment only. Valley Central School District 944 State Route 17K Montgomery, New York 12549 Phone: 845-457-2400 Note: By appointment only

Post-Bid

Educational

$500,000.00

Public - City

Renovation

96

23

8

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, References, Definitions, Reference Standards, Quality Assurance, Installer Qualifications, Manufacturer?s Field Services, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Temporary Roads, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Selective Structure Demolition, Site Remediation, Chemical Decontamination
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Specialty Placed Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Joists, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Steep Slope Roofing, Shingles and Shakes, Roof Tiles, Fire and Smoke Protection, Applied Fireproofing, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Stainless-Steel Doors and Frames, Wood Doors, Specialty Doors and Frames, Special Function Doors, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Roof Windows and Skylights, Unit Skylights, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Wood Flooring, Resilient Flooring, Carpeting, Wall Finishes, Wall Coverings, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Athletic Equipment, Recreational Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Circuit Protective Devices, Fuses, Electrical and Cathodic Protection, Facility Lightning Protection
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
464
Active Projects
274
Bidding Soon
4,323
All Active Projects
1,984
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2025

April 28, 2025

img_map_placeholder

To Be Determined, Montgomery, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Valley Central School District - 2024 Capital Project - Plumbing Construction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.