EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 29, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a power facility in Golden, Colorado. Completed plans call for site work for a power facility.

Optional concept papers may be offered and must be received in writing no later than 2:00 p.m. Mountain Time, 01/31/2025 Technical questions must be received in writing no later than 2:00 p.m. Mountain Time, 02/21/2025 The 2025 Distributed Wind Turbine Competitiveness Improvement Project (CIP) is comprised of ten (10) different topic areas, as specified in the Statement of Work (Attachment 1), dated, December 23, 2024: oPrototype Design Development oPrototype Manufacture oPrototype Installation and Testing o Component Innovation o System Optimization oSmall Turbine Certification and/or Listing oInverter Listing oType Certification and Listing oManufacturing Process Innovation oTechnology Commercialization Proposal submissions should address individual topic areas. Offerors may submit multiple proposals for multiple topic areas (parallel projects). New in 2025, offerors may submit a phased, multi-topic area proposal including up to three (3) topic areas (see 11r below). Component manufacturers must collaborate with at least one (1) turbine Original Equipment Manufacturer (OEM) and turbine OEMs may collaborate for generic parts or processes. Amendment 1 - Response to RFP questions

Post-Bid

Wind Power Generation

$2,000,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution
Division 08 - Openings

Division 08 - Openings

Hardware
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation Equipment, Solar Energy Electrical Power Generation Equipment, Wind Energy Electrical Power Generation Equipment

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
53
Bidding Soon
907
All Active Projects
430
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2025

May 27, 2025

img_map_placeholder

To Be Determined, Golden, CO

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2025 Distributed Wind Turbine Competitiveness Improvement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.