EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 18, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Canastota, New York. Completed plans call for the renovation of a educational facility.

Electrical Construction Contract (EC) Right to Waive or Reject The Owner Reserves the Right to Waive Any Informality in or to Reject Any or All Bids. Bid Security Each Bidder Must Deposit With Its Bid, Security in an Amount and Form Subject to the Conditions Provided In the Contract Documents. Withdrawal of Bids Withdrawal of Bids Will Be Subject to the Conditions Provided in the Instructions to Bidders. Completion Time Work of This Project Shall Be Completed by Dates Set Forth in Section 011100 Titled "Summary of Work." Requests for Information Requests for Interpretation, Information or Clarification (RFI ) of the Contract Documents Must Be Made in Writing to King + King Architects. Responses to Rfis Will Not Be Made Over the Telephone. Responses to Rfis Will Be Advisory Only and Will Not Modify the Contract Documents. The Contract Documents Stand as Published Except as Modified by Written Addenda Before Bid and Modifications After Execution of the Agreement. Rfis May Be Emailed to: Mr. Frank Walczak King + King Architects Llp E-mail: Fwalczak@kingarch.com and Mr. Matt Foster King + King Architects Llp E-mail: Mfoster@kingarch.com With Copy to: Vincent Donowski Vdonowski@tcco.com and Robert Pontbriand Rpontbriand@tcco.com ** Doc Info : Contract Documents May Be Examined at the Following Locations: King + King, Architects LLP 358 West Jefferson Street Syracuse, NY 13202 315.682.6180 315.682.7891 (F Plan and Print Systems, Inc. 6160 Eastern Avenue Syracuse, NY 13211 315.437.5111 315.463.1510 Upon Returning Sets Promptly and in Safe, Re-usable Condition to Plan & Print Systems, Inc. Within 30 Days After the Date of the Bid Opening, Deposits Will Be Refunded in Full. Partial Deposit Shall Be Refunded For Damaged Sets in Amount of Deposit, Less Actual Cost of Printing to Restore Set to Re-usable Condition. All Contract Documents Received (Except for Documents Held by Successful Bidders) Must Be Returned to Plan & Print Systems, Inc., at the Above Address. Roberts Street Complex (SED #25-09-01-06-0-001-030) 101 Roberts Street, Canastota, New York 13032 Peterboro Street Elementary (SED #25-09-01-06-0-005-019) 220 North Peterboro Street, Canastota, New York 13032 South Side Elementary (SED #25-09-01-06-0-004-012) 200 High Street, Canastota, New York 13032 Bus Garage (SED #25-09-01-06-5-002-011) 302 Roberts Street, Canastota, New York 13032

Post-Bid

Educational

$4,000,000.00

Public - County

Renovation

308

32

36

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Bonds, Warranties, Commissioning, General Commissioning Requirements
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Steel Joist Framing, Metal Decking, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Framing, Sheathing, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Roofing and Siding Panels, Faced Panels, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Flush Wood Doors, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Panel Doors, Sectional Doors, Entrances and Storefronts, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Roof Windows and Skylights, Hardware, Door Hardware, Glazing, Glass Glazing, Plastic Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Acoustical Panel Ceilings, Specialty Ceilings, Linear Metal Ceilings, Flooring, Wood Flooring, Resilient Flooring, Fluid-Applied Flooring, Resinous Flooring, Carpeting, Wall Finishes, Wall Coverings, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment, Entertainment Equipment, Theater and Stage Equipment, Stage Curtains, Athletic Equipment, Gymnasium Equipment, Basketball Equipment, Recreational Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics, Window Treatments, Casework, Countertops, Furnishings and Accessories, Rugs and Mats, Runners, Furniture, Seating, Multiple Seating
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools, Integrated Construction, Sound, Vibration, and Seismic Control
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, Direct-Digital Control System for HVAC, Sequence of Operations for HVAC Controls, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central Heating Equipment, Fuel-Fired Heaters, Heat Exchangers for HVAC, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Low-Voltage Controllers, Variable-Frequency Motor Controllers, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Mobile Plant Equipment, General Vehicles, Carts
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Fans, Blowers and Pumps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
93
Bidding Soon
877
All Active Projects
434
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

May 1, 2025

img_map_placeholder

Multiple Locations, Canastota, NY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Canastota Central School District 2023 Capital Improvement Project - Electrical Construction Contract

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.