EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 3, 2025 at 8:00 PM

Updated October 1, 2024

Site work and paving for a bridge / tunnel in Austin, Texas. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

FM00000052352 District/ Division: Austin County (Controlling Project): Travis Let Type: Statewide Let - CST Highway (Ccsj) : Various Type of Work (Controlling Project): Bridge Maintenance Bidder Pre-qualification Waiver: No Project Description: Bridge FUA Repairs (FY 2025) Working Day Type (Ccsj): Working Days Max. Maximum Number of Working Days: 304 Limits From: Various Locations in Bastrop, Caldwell, Limits to: Hays, Lee and Travis Counties. Guaranty: $67000 Prebid Q & A will be posted in 26 days & 10 hours. Please contact district with current questions. TXDOT: Bridge Maintenance - Various Question Deadline 04/21/2025 Contractor questions and requests for documents on this project are to be addressed to the following individual(s): Bastrop Area Diana.Schulze@txdot.gov Bastrop Area Shane.Swimm@txdot.gov South Austin Ivan.Baker@txdot.gov South Austin Tanli.Sun@txdot.gov Traffic Mahendran.Thivakaran@txdot.gov Traffic Yetnayet.Bogale@txdot.gov

Bid Results

Bridges / Tunnels

$2,334,542.00

Public - State/Provincial

Paving, Site Work

175

8

6

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Dewatering, Backfill, Embankments
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Curbs and Gutters, Planting, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
53
Bidding Soon
2,344
All Active Projects
891
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2025

June 30, 2025

img_map_placeholder

Multiple Locations, Austin, TX

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Bridge Maintenance - Various

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.