Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 26, 2025 at 8:00 PM
Updated October 1, 2024
Renovation of a military facility in Norfolk, Virginia. Completed plans call for the renovation of a military facility.
Location of the work: Naval Support Activity (NSA), Norfolk, Virginia 23551 Description of the work: The Contractor must provide supervision, labor, material, and equipment required to perform all work for the following project: Replace the air cooled chiller in the courtyard of NH-16. This will require the installation of a new chilled water supply and return tie-ins and new butterfly valves to connect a temporary chiller. The temporary chiller to be located on sidewalk near NH39 and temporary chilled water lines run to new emergency connections. A new chiller to be ordered and will require a crane to remove the existing chiller and replace with new chiller. Refer to section 6 "Project Ovewrview and Work Requirements" in the Executable Scope Document (Attachment A) for additional information. Estimated Budget Amount or Price Range: In accordance with FAR 36.204 Disclosure of the Magnitude of Construction Projects, the estimated price range for this project is between $250,000 and $500,000. NAICS Code: 238220 - Plumbing, Heating, and Air-Conditioning Contractors Time for completion: Contract completion date is 180 calendar days. The days are calculated from date of task order award, which includes the initial 15 days allowed for distribution of the task order award, submission and approval of insurance, bonding and other requirements set forth in the task order/MACC. Task order award is considered notice to proceed. Wage Rate Requirements: Department of Labor (DoL) General Decision Number: VA20250160 01/10/2025 (Attachment C) applies to this work. Should this wage determination be modified by DoL prior to award, the most current wage determination may be issued via amendment. Liquidated damages: In accordance with FAR 52.211-12 Liquidated Damages, if the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages Utilities: In accordance with FAR 52.236-14 Availability and Use of Utility Services - The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed shall be charged to or paid for by the Contractor at prevailing rates charged to the Government or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer. The Contractor shall carefully conserve any utilities furnished without charge. Record Shop Drawings: In accordance with FAR 52.236-21 Specifications and Drawings for Construction, record shop drawings are required. Reproducible copies of these record drawings are also required. Government Furnished Property: There is no Government Furnished Property. Basis for Award: This task order will be awarded on a fair opportunity basis pursuant to FAR 16.505 ordering procedures. The proposed task order will be awarded to the responsible offeror, offering the best value to the Government. For this task order, to make a determination of best value, the Government shall evaluate each offeror on price only and the basis for award will be low price. Bond Requirements: In accordance with FAR 52.228-1, Bid Guarantees, each offeror shall submit with its offer a guarantee bond (Standard Form 24) in a penal sum equal to at least 20 percent of the offer price or or $3,000,000, whichever is less. If required per FAR 28.102, Performance and Payment Bonds shall be submitted from the contract task order awardee ten (10) calendar days after date of award. Proposal Acceptance Period: 120 days from receipt of offers Pre-Propsal Inquiries (PPIs): Offerors who determine that the technical and or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing. PPIs must be submitted in writing to the Contract Specialist, Shelby Howard, at shelby.r.howard3.civ@us.navy.mil with a cc to the Contracting Officer, Nate Whybrew, at nathan.b.whybrew.civ@us.navy.mil. The cutoff for PPIs is 14 days prior to proposal due date in order to process all inquiries by the proposal due date. Additionally, all inquiries shall be submitted using the Pre-Proposal Inquiry (PPI) form (Attachment F). Do not submit the same inquiry more than once. Please verify that inquiries submitted by you on behalf of your subcontractors are not duplicates. A response will be published via website *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Sub-Bidding
Military
$500,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 31, 2025
April 30, 2025

To Be Determined, Norfolk, VA
Related To This Project
Norfolk, VA
Bid Date: Apr 23 2025
Norfolk, VA
Bid Date: Apr 01 2025
Norfolk, VA
Bid Date: Apr 15 2025
Norfolk, VA
Bid Date: Apr 11 2025
Norfolk, VA
Bid Date: Apr 22 2025
Norfolk, VA
Bid Date: Apr 14 2025
Norfolk, VA
Bid Date: Apr 10 2025
Norfolk, VA
Bid Date: Apr 24 2025
Norfolk, VA
Bid Date: Apr 04 2025
Norfolk, VA
Bid Date: Apr 07 2025
Norfolk, VA
Bid Date: Mar 14 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
NH-16 Replace Air Cooled Chiller at Naval Support Activity (NSA), Norfolk, Virginia
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.