EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 15, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a mixed-use development in Biloxi, Mississippi. Completed plans call for site work for a educational facility; and playground / park / athletic field.

Your firm is invited to submit an offer under seal to Owner for construction of a artificial turf at three project locations and associated scope of work located at: Biloxi High School. 1845 Tribe Drive, Biloxi, MS 39532 Biloxi Junior High School. 1921 Tribe Drive, Biloxi, MS 39532 Back Bay Elementary School. 360 St. Mary Boulevard, Biloxi, MS 39531 Project Description: This project consists of The construction of artificial turf grass. as described in the Construction Documents and Specifications. Bidders will be required to provide Bid security in the form of a certified check in the amount of $ or a certified check for a sum no less than 5 percent of the Bid Amount. Submit your offer on the Bid Form provided. Bidders may supplement this form as appropriate. Bids in excess of $50,000.00 must be marked on the outside of the envelope with the contractor's Mississippi certificate of responsibility number as issued by the Mississippi Board of Contractors along with a copy of the General Contractor's proof of Mississippi license. Your offer will be required to be submitted under a condition of irrevocability for a period of 60 days after submission. The Owner reserves the right to accept or reject any or all offers. Summary Project Description: This project will consist of the following general scope of work. This description is provided for convenience purposes only and shall not be considered all inclusive. It is the general contractor's responsibility to become fully famliar with the existing conditions, review all of the construction document drawings, specifications, and any additional information documents in their entirety and bring forth any and all questions regarding scope confusion, misinterpretations, and/or possible errors and omissions to the Architect and/or Engineer prior to bid submission and/or start of construction. 1. This project consists of The construction of artificial turf grass. as described in the Construction Documents and Specifications. B. Contract Terms: Lump sum (fixed price, stipulated sum). C. All bid amounts must be based on the most stringent requirement called for in the complete construction document package. In addition, the most stringent requirement shown shall govern and take precedence in the event of any and all conflicts between different drawings (plans, elevations, details, sections, schedules, etc...), between different specification sections, within specification sections, and between the drawings and the specifications. It will be the General Contractor's responsibility to bring any and all discrepancies to the architect's attention for further clarity prior to submitting a formal bid. Question Deadline 04/10/2025 Last Request for Substitution Due: 7 days prior to due date of bids. Direct questions to Brad Patano or Jack Schmidt, at email: bpatano@mpdesigngroup.us and jschmidt@mpdesigngroup.us respectively

Post-Bid

Playgrounds / Parks / Athletic Fields

$371,000.00

Public - City

Site Work

26

12

13

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Selective Structure Demolition
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Ceilings
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Rough Grading, Fine Grading, Finish Grading, Excavation and Fill, Excavation, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Mowing, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
48
Bidding Soon
500
All Active Projects
248
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2025

June 16, 2025

img_map_placeholder

Multiple Locations, Biloxi, MS

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Miscellaneous Turf Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.