BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 11, 2025 at 8:00 PM

Updated June 12, 2025

Renovation of a conference / convention center in Boston, Massachusetts. Working plans call for the renovation of a conference / convention center.

The Authority will use the RFQ/RFP process and firms interested in providing public for the Project are invited to submit a Statement of Qualifications (SOQ) to the Authority. an estimated cost of $15,000,000, located at 415 Summer St, 900 Boylston Street, and 0 Charles St, Boston, MA, Questions or requests for information, clarification or interpretation of the Request for Qualifications documents must be submitted in writing to bflynn@massconvention.com and must be received no later than 4:00 PM, May 15, 2025. Bidding procedures and award of the contract will be in accordance with the provisions of Sections 44A through 44J, inclusive, of Chapter 149 of the General Laws of the Commonwealth of Massachusetts. Each SOQ shall be submitted and will be considered in accordance with the Instructions to Bidders and other Contract Documents, and shall be accompanied by a bid deposit in the amount of 5% of the value of the bid. The Authority reserves the right to waive any informality in or to reject any or all bids if it be in the public interest to do so. The Authority reserves the right to cancel this procurement at any time without liability to any bidder or other party. The work covered in this project includes all labor, materials, equipment, services, and incidentals necessary to upgrade the existing network infrastructure at Boston Convention and Exposition Center (BCEC), Hynes Convention Center and the Boston Common Garage (BCG). This includes installation and testing of network cabling, network hardware, configuration of network switches, routers, firewalls, wireless access points, patch panels, and related components. The work shall be coordinated with the Owner's (MCCA's) IT Department and scheduled as to not interfere with activities at any of the facilities. Any activity deemed disruptive to regular business shall occur during evening/night time hours unless approved by MCCA Management.

Final Planning

Conference / Convention Centers

$15,825,215.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
566
Active Projects
316
Bidding Soon
4,087
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2025

January 1, 2026

Project location map

Multiple Locations, Boston, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.