BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 18, 2020 at 7:00 PM

Updated January 18, 2025

Demolition, site work, new construction, renovation and addition to a mixed-use development in Lovettsville, Virginia. Completed plans call for the construction of a 18,134-square-foot, one-story above grade clubhouse / community center; for the addition of a 600-square-foot clubhouse / community center; and for the renovation of a 1,200-square-foot fitness / recreation center.

The Intent of this Invitation for Bid (IFB) is for the County of Loudoun, Virginia (County) to obtain the services of a qualified general contractor to construct the new Lovettsville Community Center (New Community Center or Project). The Project includes the construction of a new one (1) story, masonry-clad building of approximately 18,134 sq. ft., as well as the approximate 600 sq. ft. addition and renovation to the existing 1,200 sq. ft. Pool House building on the same site. This new building will be constructed on a site in close proximity to the existing Community Center, which will remain in operation as a licensed preschool during various phase of construction. The New Community Center building includes a full court gymnasium with folding partition, staff office space, a fitness room, classrooms, kitchen, storage, and several meeting rooms. The work involves storefront and glazing, brick, fiberglass reinforced concrete panels, split and smooth face concrete masonry units (CMU), mechanical, electrical, and plumbing (MEP), millwork, low voltage, audio visual, other typical components of new single story construction. The Pool House building includes expanding the mens and womens showers and changing areas, a new staff break room, renovation of the public control point, first aid area, and concessions areas. The building includes storage, pump room, electrical, and chemical rooms. The Project is registered with U.S. Green Building Council (USGBC) as a Leadership in Energy and Environmental Design (LEED) project and the successful bidder will be required to employ, either directly or through a subconsultant, a LEED Accredited Professional (AP) and to comply with LEED requirements per the documents as well as document compliance through the LEED template online process, for all construction phase templates as described in the Project specifications, in order to achieve LEED certification. The existing building and pool, playground, tennis courts, outdoor basketball court and gravel parking area will remain in use and accessible to the public during various construction phases of the New Community Center. Contractor shall submit a safety plan for review per specifications and Contractor shall ensure and take every possible precaution to maintain the safety of pedestrians and vehicle traffic throughout construction on the site for access to other amenities. The pool is in operation only in the summer, and will be open to the public annually between Memorial Day Weekend and Labor Day Weekend. All work on the Pool House for renovation and addition is to occur during the off season from Labor Day Weekend to Memorial Day Weekend. Any work done during the summer months that affects the operations of the pool should be done after hours for short periods only, or with advance notice, agreement, and coordination of Community Center Staff and the Loudoun County Department of Transportation and Capital Infrastructure (DTCI). This will be a phased construction project. Phase 1 site work has been completed and is in the documents for information only. A gravel parking lot has been constructed for the public and Community Center staff and is not to be used by the Contractor. Contractor parking, staging, and laydown space is offered offsite per the civil drawings. After construction of the New Community Center and once it has achieved an Occupancy Permit, all program operations at the existing Community Center will be relocated to the New Community Center and will resume immediately. The Contractors schedule shall assume a 30 calendar day move in period between the issuance of the Occupancy Permit and the start of work in the existing Community Center. The Contractor shall then abate hazardous materials in the existing building, and proceed with the demolition of the existing building per the specifications and the Town of Lovettsvilles Conditional Use Permit (see sheet C1.5). A demolition permit is required. The Contractor shall obtain the demolition permit prior to any work on the existing structure commencing. Once demolition is complete for the existing building, the remaining parking lot work and associated utilities can be completed. During construction, the Contractor will have access to a portion of the Loudoun County Lovettsville Park project nearby for laydown and storage. This area shall be utilized by the Contractor for offsite staging / laydown, field offices, and contractor parking. The Contractor shall be responsible for securing a Land Use Permit from Virginia Department of Transportation (VDOT) for the construction entrance at this offsite area. The Construction of the Lovettsville Park will be complete prior to the end of this Project and the Contractor must coordinate and cannot delay the activities of the Lovettsville Park contractor. See sheet C4.6 for more information. Before removal of any asphalt paving on the New Community Center site (Site), the Contractor is to notify DTCI and Loudoun County Department of Planning and Zoning seven (7) calendar days in advance so they can have staff onsite to watch for possible artifacts and features that might denote the presence of an archaeological site sealed under the pavement. The Contractor shall use only smooth bucket backhoes for asphalt removal and shall allow Loudoun County Staff to witness removal of pavement and investigate as removal occurs. Should artifacts be found on the Site at any time by the Contractor, subcontractors, or by Loudoun County Staff, the County may require the area of the artifact to be left undisturbed for a minimum of forty-eight (48) hours to allow for further investigation. The costs associated with the removal of any and all unsuitable soils and/or rock encountered below subgrade (as defined in Specification 312000), during the construction of this Project shall be borne by the County. The County requests that the Contractor provide unit prices for unsuitable soils removal and rock removal. Unit Prices shall include the import of suitable material as needed to replace those quantities removed (It shall be assumed that suitable material will be procured from an off-site source). Bidders shall provide unit prices and extended prices on the Pricing Page. The extended price will be carried by the County as an Owners Allowance in the final Contract Price and will be paid to the Contractor on a per occurrence basis, with any remaining allowance(s) being returned to the Owner upon completion of the Project. This will apply to all excavations. Furthermore, the Contractor will be responsible for the removal of all vegetation as required by the Contract Documents, to include, haul-off and disposal. Excess top-soil and spoils shall be removed from the Site. Hauling and disposal of this excess top-soil and spoils shall be included in the Contractors Lump Sum Price. Should the Contractor require the import of suitable materials to maintain the elevations and grades shown on the Contract Documents, then the Contractor shall be responsible for the costs of the suitable materials, inclusive of hauling, placement, and compaction. The condition and suitability for use in the construction of this project for the above materials shall be verified by the Contractor. Refer to Paragraph 19.4 for details on how to schedule a materials inspection visit. The County shall not be responsible for any costs associated with the reuse of this material during construction. Contractor shall be responsible for removing and properly disposing of all unused materials in the offsite laydown area. Under a separate contract, the County has installed the geothermal well field, geothermal vault and supply / return laterals, through the existing gravel access road, which will serve the new Community Center. It shall be the Contractors responsibility to provide a complete system warranty for the geothermal system, after connection is made to the existing elements, at no additional cost to the County. The Contractor shall be responsible for all surveying to ensure the Project is installed per the Construction Documents. Any deviations from the Contract Documents shall be specifically requested via Request for Information (RFI) submitted via e-Builder to the Architect/Engineer of Record. All deviations shall be noted in the Contractors Record Set of Construction Documents. Upon completion of the Project, two (2) hard-copy sets, and one (1) digital copy of Record Set Construction Documents shall be provided to the County. Addendum #1 has been issued - replaced all 3 plan files and 2 spec files, old plans no longer posted. Addendum #2-#9 have been issued.

Award

Clubhouse / Community Centers

$8,708,250.00

Public - County

Addition, Demolition, LEED Certification, New Construction, Renovation, Site Work

210

40

26

10

Subscribe For Documents

84 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
4
Bidding Soon
1,728
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2020

November 30, 2020

Project location map

57 E Broad Way, Lovettsville, VA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.