BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 24, 2023 at 7:00 PM

Updated January 26, 2024

Demolition, site work, paving, new construction and renovation of a bridge / tunnel in Bradenton, Florida. Design plans call for the construction of a bridge / tunnel.

The plans included eight possible options, ranging in design, cost, renovation, and total reconstruction that have been developed over the course of an engineer study. It was decided that the project would be a 65-foot clearance bridge. As of January 2023, the project is in early design and in the Environmental Resource Permit process. The project is in the community outreach phase. Construction is expected to begin in 2025.

Design

Bridges / Tunnels

$72,000,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
265
Active Projects
138
Bidding Soon
1,913
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

Project location map

Cortez Rd W, Bradenton, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.