Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 14, 2023 at 7:00 PM

Updated January 26, 2024

Site work and new construction of a power facility in Tularosa, New Mexico. Completed plans call civil work for a power facility.

Design plans call for a 515-mile electric transmission line that will stretch between New Mexico and Arizona. The project consists of two bi-directional extra-high voltage electric transmission lines and substations. Transmission capacity will be 3,000 megawatts across its entire length for two single-circuit 500 kV AC lines. As of November 24v 2023, construction has been halted due to immediate intervention for the Tohono O’odham Nation.

Under Construction

Power Plant

$2,000,000,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
8
Bidding Soon
164
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2023

Project location map

Multiple Locations, Tularosa, NM

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed