BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Fort Walton Beach, Florida. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of April 11, 2023, construction has commenced. Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es) Selection Method : Adjusted Score Response Requested : Letter of Interest SR 30 (US 98) Brooks Bridge Replacement Duration- The Department has established a Contract Duration of 1,720 calendar days for the subject Project. TRC Members (Subject to Change) : Anna Harlson Benjamin Smith Billy Robinson Heather Baril Keith Shores The Financial Project Number associated with this project is 41547425201, 415474-2-56-01 Phase I Selection Date/Time 9/07/2021 07:30 pm Pre-Proposal Meeting Date/Time 9/22/2021 12:00 am Tech Proposal Due Date/Time 2/11/2022 01:30 am Bid Price Due Date/Time 4/21/2022 08:30 pm Bid Opening Date/Time 4/21/2022 09:00 pm Final Selection Date/Time 4/25/2022 07:30 pm FDOT - RFP D/B - SR 30 (US 98) Brooks Bridge Replacement Replacement of Brooks Bridge (Bridge No. 570034) over Santa Rosa Sound in Okaloosa County, Florida This project will also include roadway widening, new roadway connections, and milling and resurfacing within the limits of SR 30 (US 98) from west of SR 145 (Perry Avenue) to Pier Road, side street reconstruction, intersection reconstruction, signalization, Intelligent Transportation Systems, stormwater ponds, storm drain, signing and pavement marking, and replacement of the fender system. The Design-Build Firm will be required to design and construct roadway widening on SR 30 from west of SR 145 to west of Pier Road and two new bridges spanning Santa Rosa Sound. Except as allowed by Section I.A. of this RFP, design and construction shall be consistent with the approved Environmental Assessment (EA) with Finding of No Significant Impact (FONSI) and Reevaluation. The project includes bridge replacement, roadway widening, milling and resurfacing, new roadway connections, side street reconstruction, intersection reconstruction, signalization, stormwater ponds, storm drain, and replacement of the fender system.

Under Construction

Bridges / Tunnels

$171,025,550.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
60
Bidding Soon
961
All Active Projects
456
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 4, 2022

April 3, 2023

November 5, 2027

img_map_placeholder

US-98, Fort Walton Beach, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.