Site work for a water / sewer project in Tuscaloosa, Alabama. Completed plans call for site work for a water / sewer project.

The Project shall be known as Queen City Sewer Jumper Line Project- Phase 1 and the general character of said public works project shall consist of the following: The upgrade of sanitary sewer lines in the general vicinity of Jack Warner Parkway and 21st Avenue. Award of the contract will be made within forty-five (45) calendar days from the date of the bid opening. The approximate quantities of said Project are as follows: Installation of approximately 328 LF of 6" PVC sanitary sewer pipe, 12 LF of 12" ductile iron sanitary sewer pipe, 625 LF of 30" ductile iron sanitary sewer pipe, 64 VF of precast sanitary sewer manhole, 3 pipe bents for an elevated sewer crossing and all other items required to complete the job as listed in the Bid Schedule found herein. Time of Construction: From the date stated in the Notice to Proceed, the Project time of construction is 60 consecutive calendar days. All eligible refunds of deposits for plans and specifications will be made by the City within twenty (20) days of bid opening. Bid Bonds: Each bidder must submit with its bid a cashier's check drawn on an Alabama bank or a fully executed bid bond on the form that is contained in the Contract Documents executed by a surety company duly authorized and qualified to make bond in the State of Alabama. All bonds, sureties and/or cashier checks will be made payable to the City for an amount not less than 5 percent of the City's or its engineers or architects estimated cost of the Project or of the total bid in the proposal, but in no event more than $10,000.00 Additional sets of bid documents for prime Contractor bidders, subcontractors, vendors or dealers may be obtained upon payment of the same deposit. Such deposits will be refunded, less the cost of printing, reproduction, handling and distribution, if all the documents are returned in reusable condition within ten (10) days of bid opening. Electronic copies of the plans, specifications and Contract Documents may be obtained at no cost upon written request to the above contact person.

Award

Water / Sewer

$621,217.00

Public - City

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
41
Bidding Soon
542
All Active Projects
230
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2019

October 28, 2019

img_map_placeholder

Multiple Locations, Tuscaloosa, AL


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.