BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 23, 2022 at 8:00 PM

Updated November 15, 2023

Site work and new construction of a bridge / tunnel in Bradenton, Florida. Design plans call for the construction of a bridge / tunnel.

The project consists of a new fixed-span, high-level bridge with 65 feet of vertical clearance. The project also calls for improvements to State Road 64, including the addition of 10-foot sidewalks and 7-foot-wide bike lanes. As of March 23, 2022, phase two of design work has been approved. Phase three of design should be completed late summer 2022; however, the project is then expected to go on long-term hold pending funding. There will be four phases of design before bids are let. Design work is not expected to be completed before late 2027. Construction is not anticipated to begin prior to early 2028.

Design

Bridges / Tunnels

$76,000,000.00

Public - State/Provincial

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
269
Active Projects
109
Bidding Soon
1,887
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.