Site work and new construction of a library in Lincoln, Nebraska. Completed plans call for the construction of a library; and for site work for a library.

Question Deadline 07/09/2025 at 2:00 PM CT The City of Lincoln has previously engaged with BVH Architects for programming and schematic design for the facility. The existing SCC building is located at 1111 O Street, and the new library will repurpose and expand upon the existing building at the same location. The primary objective is to add a thriving central library that supports innovation and learning, and that will be critical to the city's growth The City of Lincoln reserves the right to accept or reject any or all letters submitted. A. The CMAR will begin with the City of Lincoln in a support role for the design phase services and will hold the construction contract with the City of Lincoln for construction of the project. B. The City of Lincoln will enter a direct contract with the selected CMAR for pre-construction services. Pre-construction services will be ongoing throughout the design process and will include an initial cost estimate, a preliminary Guaranteed Maximum Price (GMP) during design development, and a final GMP prior to completion of the construction documents. C. Prior to completion of the construction documents, the CMAR will assume the risk of delivering the project through a Guaranteed Maximum Price (GMP) contract. Early GMPs may be developed for procurement items and/or initial construction activities. A final GMP will be developed to complete all remaining required construction activities. If the City of Lincoln and the CMAR contractor negotiate and agree to a GMP for construction within the specific GMP scope of work, as well as agree to the construction phasing, the sequence of construction and the construction schedule, then the City of Lincoln and the CMAR contractor will enter a construction contract to perform the work as per the terms of the agreement. If the City of Lincoln and the CMAR are unable to negotiate GMP and/or an agreement to the Project, then the City of Lincoln may proceed with the next qualified CMAR

Post-Bid

Library

$45,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
84
Bidding Soon
861
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2025

October 23, 2025

Project location map

1111 O St, Lincoln, NE


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.