Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, renovation and addition to a mixed-use development in Burlington, Vermont. Working plans call for the addition of a 114,012-square-foot educational facility; and for the renovation of a educational facility.
The project will construct a new 96,681 sf, ~ 3,000 seat multipurpose events center to be situated between the existing Gutterson Field House and Patrick Gym facilities. The proposed events center will replace Patrick Gym for basketball games and other events. Patrick Gym will be converted to a practice facility. There will be no net increase in the number of spectator seats. A 17,331 sf addition is also proposed along the north side of the existing athletics complex to house additional health and wellness facilities. A new concourse is proposed along the south side of Gutterson. A 150-space parking lot will be removed to accommodate the new multipurpose events center. Some new parking is included in the project design (16 spaces), but more importantly, the project is addressed in the current Joint Institutional Parking Management Plan. As of September 30th, 2022 this project is set to be voted on by the school board at the end of October of 2022. A general contractor has been confirmed. There is no confirmed construction timeline available at this point in time. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Pre-Construction/Negotiated
Educational
$95,000,000.00
Public - State/Provincial
Addition, Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 6, 2023
97 Spear St, Burlington, VT
Related To This Project
Burlington, VT
--
Burlington, VT
--
Burlington, VT
Bid Date: Sep 29 2023
Burlington, VT
Bid Date: Oct 13 2023
Burlington, VT
--
Burlington, VT
Bid Date: Nov 13 2023
Burlington, VT
--
Burlington, VT
Bid Date: Jan 31 2024
Burlington, VT
--
Burlington, VT
Bid Date: Mar 24 2022
Burlington, VT
Bid Date: Mar 14 2022
Burlington, VT
Bid Date: Feb 17 2022
Burlington, VT
--
Burlington, VT
Bid Date: Jan 21 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.