BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 22, 2024 at 8:00 PM

Updated August 23, 2024

Site work and renovation of a civil project in Corpus Christi, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The project scope of work includes: Furnish, install, test, and provide assistance during commissioning for improvements at the Bloomington and Woodsboro raw water booster pump stations that serve the City of Corpus Christi's Mary Rhodes Pipeline. The work includes the following: Bloomington Booster Pump Station: A new horizontal split-case centrifugal pump and associated pipe, valves, and fittings. Two new medium voltage variable frequency drives (VFD), one for the new pump and one to replace an existing VFD on an existing pump. Remove hydro-pneumatic valve actuators on the pump discharge flow control valves and replace with new electric motor valve actuators for four existing pump trains and one new pump train. A new electro-magnetic flow meter within a new concrete vault, associated connections to the existing pipeline, and electrical and signal cabling and conduits. New sump pumps: three in existing valve vaults and one in the new meter vault, and associated controllers, electrical and signal cabling, and conduits. Sump pump discharge piping from the vaults to the existing water storage tank. One new low voltage emergency generator and associated duct bank. Two new outdoor air conditioning units, modifications to two existing air handler units, and associated modifications to ducting, louvers, wiring, and controls. Replacement of heaved concrete panels adjacent to the storage tank. Selective process mechanical, building mechanical, and electrical demolition. Instrumentation and controls programming associated with the new pumps, pump control valves, and flow meters. Woodsboro Booster Pump Station: One new medium voltage variable frequency drive (VFD) to replace an existing VFD on an existing pump. Remove hydro-pneumatic valve actuators on the pump discharge flow control valves and replace with new electric motor valve actuators for four existing pump trains. A new electro-magnetic flow meter within a new concrete vault, associated connections to the existing pipeline, and electrical and signal cabling and conduits. New sump pumps: three in existing valve vaults and one in the new meter vault, and associated controllers, electrical and signal cabling, and conduits. Sump pump discharge piping from the vaults to the existing water storage tank. One new low voltage emergency generator and associated duct bank. Two new outdoor air conditioning units, modifications to two existing air handler units, and associated modifications to ducting, louvers, wiring, and controls. Selective process mechanical, building mechanical, and electrical demolition. Instrumentation and controls programming associated with the new pumps, pump control valves, and flow meters. The Work is required to be substantially completed within 400 calendar days after the date when the Contract Times commence to run as provided in the Notice to Proceed and is to be completed and ready for final payment in accordance with Paragraph 17.16 of the General Conditions within 430 calendar days after the date when the Contract Times commence to run. All inquiries or requests regarding this RFB must be submitted in writing online via CivCast only using the electronic question submission feature specific to this RFB. Such inquiries or requests must be submitted by the due date and time for clarifications provided The security must be payable to the City of Corpus Christi, Texas in the amount of 5 percent (5%) of the greatest amount bid. Bid Security may be in the form of a Bid Bond or a cashier's check, certified check, money order, or bank draft from a chartered financial institution authorized to operate in the State of Texas. fails to provide the required Performance and Payment Bonds. The City reserves the right to: cancel this RFB at any time reject any or all bids submitted in response to this RFB waive any material defect, irregularity or informality in any bid or bidding procedure; The Procurement Officer reserves the right to waive minor irregularities and mandatory requirements. This right may be exercised at the sole discretion of the Procurement Officer.

Bid Results

Water / Sewer

$10,940,274.00

Public - City

Renovation, Site Work

87

31

45

5

Subscribe For Documents

75 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
0
Bidding Soon
175
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2024

September 23, 2024

Project location map

Multiple Locations, Corpus Christi, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.