BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 5, 2021 at 7:00 PM

Updated January 26, 2024

Demolition, site work, paving and new construction of a municipal facility in St George, Utah. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

As of January 05, 2021 this project has begun construction. Construction is expected to last through September 2022. All county services will remain in their existing locations through construction. *The closed solicitation has been included below for reference: Design Build services for a new Washington County Administration Building project. For questions regarding this project, please contact County Administrator Nicholle Felshaw at (435) 634-5700 or by email. The selection requirements and the selection schedule will be available from the Washington County Administration Office on Tuesday, November 12, 2019 The Washington County Commission reserves the right to reject any or all proposals, or to waive any formality or technicality in any proposal in the best interest of the County. The new Administration Building will house County offices and departments in one facility in order to more efficiently provide services to the growing population of Washington County. The offices/departments that will be housed in the facility include: Commission Office, Clerk/Auditors Office, Treasurers Office, Assessors Office, Recorders Office, Human Resources, Community Development, Public Works, Geographic Information System, Information Technology, Tourism, Emergency Services, Habitat Conservation Plan, and Building Maintenance. This facility will be approximately 80,000 square feet in size and will be three stories tall. It will include public meeting chamber, office space, conference rooms, break rooms that include kitchen facilities, outdoor break areas, bathrooms, mail room, storage, records archive space (with extra fire and climate control protections), computer server room (with access restrictions and climate control), emergency command center, elevators, water bottle refill stations, secured underground parking, and low-water landscaping. It will also include an approximately 72,000 square foot, three level parking structure adjacent to the building.

Under Construction

Municipal

$25,000,000.00

Public - County

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
9
Bidding Soon
147
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2019

December 1, 2020

Project location map

111 E Tabernacle St, St George, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.