Site work, new construction and addition to a municipal facility in Calexico, California. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.
As of February 6, 2025, project is still in the design phase and buyout is not yet complete. Construction is now scheduled to commence 4th quarter 2025. Information on the bidding process and bid documents will only be shared with prequalified contractors. Interested parties are encouraged to visit: https://www.henselphelps.com/trade-partners/ Original solicitation: This Request For Proposal is for the services of a highly qualified Design-Build (DB) contractor to successfully complete Phase 2B of the Modernization and Expansion of the Calexico West Land Port of Entry. The Design-Build Scope of Work includes all labor and materials required to provide Architectural, Engineering, Construction, and other related services necessary to successfully complete the project in compliance with all applicable codes. Given the size, complexity, uniqueness, and overall importance nationally and locally, the DB contractor must have the capability and experience to meet all of the GSA's contract requirements. Note: In addition to the construction opportunity reflected herein, GSA is seeking suppliers and manufacturers that are interested in supplying low embodied carbon asphalt, concrete (and cement), glass and steel materials for the project. Suppliers and manufacturers of materials meeting GSA's Inflation Reduction Act Low Embodied Carbon Material Requirements (attached) may submit an Expression of Interest to the contact below no later than February 15, 2024. Expressions of Interest should indicate materials available and global warming potential values reflected in materials' environmental product declarations. Submission of an expression of interest grants GSA your permission to publish your firm's contact information and offerings for use by potential offerors on the construction requirement. Supplier and manufacturer contact information will be published in an informational amendment issued by GSA. By participating in the competition, offerors consent to GSA sharing their suppliers' names and the global warming potential values associated with suppliers' materials with the successful offeror. Technical solutions, supplier pricing, and supplier-offeror terms and conditions will not be shared, in accordance with the Procurement Integrity Act. Project Description The Calexico West Land Port of Entry (LPOE) is one of the busiest crossings on the southern border. The space required for modern inspection technologies is insufficient and the ability of the Department of Homeland Security (DHS), U.S. Customs and Border Protection (CBP) to accomplish its rapidly changing mission is seriously compromised by the existing facilities. When completed, the project will provide proper operational space for port operations, with reduced traffic congestion and a safe environment for port Customs and Border Protection (CBP) staff and the general public. The overall project involves the demolition of the current Pedestrian and Northbound POV inspection facility and the construction of a new Pedestrian Processing Facility. The downtown Calexico port is the principal gateway between California's Imperial Valley and the Mexican State of Baja California. On an average day, over 16,000 privately operated vehicles and 12,500 pedestrians enter the United States through this port. The existing facilities are undersized for today's traffic loads and obsolete in terms of inspection, CBP officer safety and border security. Currently, pedestrian inspection delays cause significant impact to the Imperial Valley economy. The LPOE's existing structures is being replaced by three (3) buildings totaling 106,605 GSF. The project is being implemented in three (3) phases. Phase 1 Construction, completed in 2018, provided a Head House, ten (10) of the project's sixteen planned (16) northbound POV inspection lanes; including Primary and Secondary inspection canopies; southbound POV inspection lanes with temporary asphalt paving; and a bridge across the New River for southbound POV traffic. Phase 2A is scheduled to be completed at the beginning of 2024 which includes selective demolition and modification of existing areas to allow the construction of Phase 2A; a new Administration building; Permanent southbound Privately-Owned Vehicle (POV) non-commercial inspection lanes, inspection islands, booths, canopies and permanent concrete paving; A preprimary inspection canopy for the northbound POV lanes heading into the United States; New POV northbound inspection lanes including, inspection islands, booths, canopies and concrete paving, and expanding the secondary POV inspection area; A new employee parking lot adjacent to southbound inspection that includes an underground pedestrian tunnel from the parking lot under the southbound lanes; and extension of utilities for future Pedestrian building project. The third phase and subject of this solicitation notice is Phase 2B which includes: Temporary Pedestrian Processing with a secure pathway to and from the current pedestrian border crossing into Mexico. Pedestrian Processing Facility replacement to include an and a vehicular crossing over United Pacific Railroad (UPRR) tracks. Options 1 through 14 Video Surveillance System Access Control and Alarm System Communications and IT system Public Address System Border Wall Photovoltaic (PV) System West Parking Shade Structures Northbound Exit Improvements Skybridge Furniture, Fixtures & Equipment Pedestrian Port Runner Suppression System Digital Signage Calexico Land Port of Entry Campus PV Tunnel and Basement Connection CONTRACT TYPE: The contract type will be Firm-Fixed Price Design -Build contract. PRICE: The Calexico Phase 2B construction project including base and all options is estimated to be between $120,000,000.00 and $200,000,000.00, subject to available of funds. The NAICS Code for this procurement is 236220.
Under Construction
Municipal
$175,832,000.00
Public - Federal
Addition, New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
17
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 28, 2024
October 1, 2025
200 E 1st St, Calexico, CA
Related To This Project
Calexico, CA
Bid Date: Mar 29 2023
Calexico, CA
Bid Date: May 02 2023
Calexico, CA
Bid Date: Jun 06 2023
Calexico, CA
Bid Date: Jun 02 2023
Calexico, CA
Bid Date: Jun 09 2020
Calexico, CA
Bid Date: Jun 06 2019
Calexico, CA
Bid Date: Jun 20 2023
Calexico, CA
--
Calexico, CA
Bid Date: Jan 31 2023
Calexico, CA
Bid Date: Sep 19 2022
Calexico, CA
Bid Date: Jun 15 2022
Calexico, CA
--
Calexico, CA
Bid Date: Aug 16 2022
Calexico, CA
Bid Date: Apr 29 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.