Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a detention facility in Centerville, Iowa. Completed plans call for the construction of a 22,780-square-foot, two-story above grade, 37-cell detention facility; and for site work for a detention facility.
All bids shall be made on forms furnished by the Appanoose County Board of Supervisors, and must be enclosed in a separate sealed envelope and plainly identified. Each proposal shall be accompanied by a bid bond, cashier's or certified check or a credit union certified share draft, in a separate sealed envelope in an amount equal to Five percent (5%) of the total amount of the proposal. The certified or cashier's check shall be drawn on a bank in Iowa or a bank chartered under the laws of the United States or said certified share draft should be drawn on a credit union in Iowa or chartered under the laws of the United States; and such check or share draft shall be made payable to Appanoose County as security that if awarded a contract by resolution of the Appanoose County Board of Supervisors, the bidder will enter into a contract at the prices bid and furnish the required Performance and Payment Bond and Certificate of Insurance. The certified or cashier's check or certified share draft may be cashed if the Contractor fails to enter into a contract, or fails to provide a certificate of insurance on the form provided in the specifications, within ten (10) days after the acceptance of the Contractor's proposal by resolution of the Appanoose County Board of Supervisors. No successful bidder may withdraw a proposal within sixty (60) days after the date set for opening bids. The extent of the work on this project is the furnishing of all labor, equipment, and materials for the construction of the Appanoose County Law Enforcement Center generally described as follows: The new Law Enforcement Center will be built on the new site and will be approximately 22,293 square feet to accommodate Sheriff Administrative Offices, City Administration Offices, E-911 / Dispatch, jail, and support areas. The primary components of the building consist of precast panels, masonry block, and metal studs. The building will accommodate a 32 bed jail with expansion capability of 28 beds within the existing facility which will be bid as alternates to the project. Bid Package I will consist of multiple prime contracts. Bidders may submit proposals on individual prime contracts or multiple prime contracts on the combined bid form. Contract 1 General Construction Contract 2 Security Metal Doors, Frames, Hardware & Equipment & Security Electronics Contract 3 Plumbing Contract 4 HVAC Contract 5 Electrical / Security Electronics Conduit & Wiring Contract 6 Fire Sprinkler System Work under the Contract for this Bid Package shall commence within seven (7) days of the written "Notice to Proceed" and shall be fully completed and ready for Owner occupancy pursuant to the Construction Schedule but in no event later than June 1st, 2022. Each successful Bidder will be required to furnish Performance and payment Bonds in the amounts equal to one hundred percent (100%) of the contract amount. The Appanoose County Board of Supervisors reserve the right to defer acceptance of any proposal for a period not to exceed sixty (60) calendar days after the date bids are to be received. By virtue of statutory authority and to the extent required by state law, a preference will be given to products and provisions grown and coal produced within the state of Iowa. The Appanoose County Board of Supervisors reserve the right to reject any or all bids and to waive any informalities and irregularities. Bid Result : General Construction - Contract 1 - SG Construction -$ 3,725,362.00 DEC & Security Electronics - Contract 2 - Noah Detention Construction - $ 1,032,000.00 Plumbing - Contract 3 - Tony's Plumbing - $ 581,213.00 HVAC - Contract 4 - Proctor Mechanical - $ 788,600.00 Electrical - Contract 5 - Van Maanen Electric - $ 684,212.00 Contract 6 - Fire Sprinkler - Winger Contracting Co. - $ 131,773.00
Award
Jails / Prisons
$6,943,160.00
Public - County
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 30, 2021
May 31, 2021
22158 Dewey Rd, Centerville, IA
Related To This Project
Centerville, IA
Bid Date: Sep 28 2021
Centerville, IA
Bid Date: May 03 2022
Centerville, IA
Bid Date: Apr 21 2022
Centerville, IA
Bid Date: May 16 2022
Centerville, IA
Bid Date: Apr 14 2022
Centerville, IA
Bid Date: Feb 02 2021
Centerville, IA
Bid Date: Oct 31 2018
Centerville, IA
Bid Date: Jul 21 2022
Centerville, IA
Bid Date: Oct 01 2018
Centerville, IA
Bid Date: Dec 20 2022
Centerville, IA
Bid Date: Nov 15 2022
Centerville, IA
Bid Date: Nov 15 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.