BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a civil project in San Diego, California. Completed plans call for site work for a water / sewer project; road / highway; for paving for a road / highway; for the demolition of a water / sewer project; and for the construction of a water / sewer project.

The project consists of the demolition of existing facilities at the proposedMorena Pump Station site, the construction of a new 37.7 MGD Morena Wastewater PumpStation Facility, including Odor Control Systems, Electrical Building, Screening Facility, HighPurity Oxygen System, Maintenance Building, associated civil site work including storm drainage, yard piping, perimeter walls, access gates, pavement, landscaping and other appurtenances. The project also includes the construction of 48-inch, 60-inch & 66-inch diversion and overflow sewers, three diversion structures with slide gates and one junction structure on Friars Rd. 1.1 The Work shall be performed in accordance with: -Plans numbered 40421-1-D through 40421-286-D for the Morena Pump Station.-General Requirements as detailed in DIV 01 of CSI shall support equivalent sections as defined in the Whitebook.-The "Technical Specifications" are broken down such: DIV 01 shall be applied to all aspects of the aforementioned items, including all work within Friars Road and adjacent to the Pump Station Site; DIV 02 through DIV 44 shall only be applied to all work within the Pump Station Site, all trenchless work and all junction and diversion structures.- Right of Way Improvements not described above such as curb, gutter, sidewalk, asphalt paving, driveways and traffic control shall be performed per Whitebook and City Standards unless otherwise noted. -If there is an apparent conflict between the Technical Specifications and the Greenbook or Whitebook, the most stringent requirements shall apply. Contractor and Subcontractor Registration Requirements. This project is subject to compliance monitoring and enforcement by the DIR. A contractor or subcontractor shall not be qualified to bid on, be listed in a bid or proposal, subject to the requirements of section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered and qualifiedto perform public work pursuant to Labor Code section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded. A Contractor's inadvertent error in listing a subcontractor who is not registered pursuant to Labor Code section 1725.5 in response to a solicitation shall not be grounds for filing a bid protest or grounds for considering the bid nonresponsive provided that any of the following apply: (1) the subcontractor is registered prior to bid opening; (2) within twenty-four hours after the bid opening, the subcontractor is registered and has paid the penalty registration fee specified in Labor Code section 1725.5; or (3) the subcontractor is replaced by another registered subcontractor pursuant to Public Contract Code section 4107. By submitting a bid or proposal to the City, Contractor is certifying that he or she has verified that all subcontractors used on this public work project are registered with the DIR in compliance with Labor Code sections 1771.1 and 1725.5, and Contractor shall provide proof of registration for themselves and all listed subcontractors to the City at the time of bid or proposal due date orupon request. The City affirms that in any contract entered into pursuant to this advertisement, DBE will be afforded full opportunity to submit Bids in response to this invitation. This Federally assisted project includes subcontracting participation percentages for DBE participation. DBE goal commitments and Good Faith Efforts (GFE) shall be made prior to bidding. DBE commitments and GFE made after the Bid opening will not be considered for the Award of Contract. This project is subject to the federal equal opportunity regulations and the following requirements. The City reserves the right to audit the Contractor's compliance with the federal requirements set forth below. The following are federally subcontracting participation percentages. For the purpose ofachieving the subcontractor participation percentage, Additive or Deductive Alternates and Type II Allowance Bid Items will not be included in the calculation. Environmental Protection Agency (EPA) - In accordance with EPA's Program for Utilization ofSmall, Minority Disadvantaged and Women Business Enterprises in procurement underFederal assistance programs, the Contractor agrees to the applicable "fair share" objectivesnegotiated with EPA as follows: California State Water Resources Control Board Clean Water State Revolving Fund (CWSRF): MBE* WBE* 1. Construction 2% 1% 2. Supplies 1% 1% 3. Services 1% 1% 4. Equipment (combined in above) 1% 1% Note: MBEs and WBEs shall be certified by EPA, SBA, DOT or by state, local, Tribal, or private entities whose certification criteria match EPAs in order to be counted toward MBE/WBE accomplishments. MBEs and WBEs are a part of the larger universe of DBEs. Bid SHALL be declared non-responsive if the Bidder fails any of the following conditions:1. Submission of GFE documentation, as specified in Attachment D.2. Attending the Pre-Bid Meeting.3. Bidder's submission of Good Faith Effort documentation, saved in searchable Portable Document Format (PDF) and stored on Compact Disc (CD) or Digital Video Disc (DVD), demonstrating the Bidder made a good faith effort to outreach to and include DBE Subcontractors shall be submitted within 4 Working Days after the Bid opening. This Contract Will Be Subject to the Following:- Phased-funding- Federal Equal Opportunity Contracting Requirements.- Eligible for Joint Venture Prequalification Status (See Instructions to Bidders)- Prevailing Wage Rates: State and Federal- Apprenticeship- Skilled and Trained Workforce- This Is a Cwsrf and Epa Funded Contract Through the State of Californa and Environmental Protection Agency. Solicitation Number - K-21-1801-DBB-3-A

Award

Water / Sewer

$110,386,350.00

Public - City

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

249 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
44
Bidding Soon
735
All Active Projects
321
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2021

May 28, 2021

img_map_placeholder

To Be Determined, San Diego, CA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.