Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 25, 2022 at 8:00 PM
Updated September 14, 2023
Site work and paving for a sidewalk / parking lot in Burlington, Ontario. Conceptual plans call for paving for a sidewalk / parking lot; and for site work for a sidewalk / parking lot.
Construction of improvements to existing infrastructure at the Aldershot GO Station. The scope will include 450 new parking spaces next to the existing south parking lot (with a provision for another 450 spaces in the future). A new kiss & ride zone and bike shelter in the new parking lot, and alterations or replacement of the service buildings on the site as part of the relocation of the main entrance and service buildings. TIMELINE: This project has been cancelled by the owner; the project will not proceed. Coverage of this report is discontinued.
Project Abandoned
Sidewalks / Parking Lot
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
