BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, new construction and renovation of a mixed-use development in Toronto, Ontario. Completed plans call for the renovation of a transportation facility; for the construction of a 40,500-square-foot, two-story above grade transportation facility; for the demolition of a transportation facility; and 15,000-square-foot, two-story above grade transportation facility.

This project is being bid by invitation only for PREQUALIFIED firms; list is INCOMPLETE. If you have been contacted by the owner to bid on this project as a prime contractor, and would like to be listed below, please notify our editorial staff at research.canada@constructconnect.com Construction services for the Warden Station Redevelopment Project as follows: - New street-level bus terminal building, site, and dedicated driveway with new above ground bus terminal concourse level for access to the existing subway station Concourse Level. - Two (2) new escalators and two (2) new elevators (Elevators E3 and E4) for access between the street level and concourse level of the new bus terminal. - New retail spaces, new service rooms, back-of-house rooms, and staff washrooms. - Temporary bus platform and shelters. - Temporary bus stops and shelters on Warden Avenue. - Demolition/Removal of existing and construction of new Passenger Pick-Up and Drop-Off (PPUDO) with short-term public parking spaces. - Demolition/Removal of existing and construction of new TTC South Commuter Parking Lot. - Modifications to existing right lane, boulevard, and sidewalk along Warden Avenue. - Modifications to existing bus terminal and PPUDO driveway entry ramps on St. Clair Avenue East. - New retaining wall for the aboveground subway track-level embankment along the new - PPUDO area and TTC South Commuter Parking Lot. - Upgrades to the electrical distribution and other site improvements and upgrades. EllisDon has announced it has been selected to lead the Warden Station redevelopment project in Toronto for the TTC. The redevelopment will introduce a transit hub, CreateTO mixed-income housing and new public spaces around Taylor Massey Creek, stated a release. Warden Station, a central transfer point on Line 2, has been part of Toronto's transit network since the 1960s. The redevelopment will make the station fully accessible and upgrade passenger access, said the constructor. The project will start with the establishment of a new accessible entrance that includes elevators linking the entrance, concourse and subway platform levels. The existing bus terminal will then be replaced. The station will remain operational throughout the redevelopment.

Award

Transportation Terminals

$627,000,000.00

Public - City

Demolition, New Construction, Renovation

581

26

408

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
427
Active Projects
220
Bidding Soon
4,395
All Active Projects
1,704
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 25, 2023

January 1, 2024

March 31, 2028

img_map_placeholder

701 Warden Ave., Toronto, ON


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.