Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 19, 2026 at 8:00 PM

Updated October 24, 2026

Site work and renovation of an educational facility in Donnelly, Alberta. Design plans call for the renovation of a educational facility.

Rightsizing and modernization of the existing school, which has an existing capacity of 788 students in grades 7 to 12. The rightsizing of the school will reduce the capacity by demolishing a portion of the school and adding to the size of the gym space. Existing gross floor area is 7,068 m2 while the planned gross floor area at opening is 5,178 m2, final reduced capacity resulting from the rightsizing exercise to be determined as part of the design phase. TIMELINE: Project is in design. Project delivery method is Design Bid Build. Tender and construction are tentative for late 2026/early 2027.

Design

Educational

$39,183,658.00

Public - State/Provincial

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
1
Bidding Soon
34
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed