BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 21, 2022 at 8:00 PM

Updated January 25, 2024

Site work for a mixed-use development in Burnt Point Bdv, Newfoundland. Conceptual plans call for site work for a power facility.

Development of a 2,250 MW generation facility in Gull Island and the associated transmission links; a powerhouse containing five Francis turbines; a concrete-faced dam (99 m high and 1,315 m long); a 213 km2 reservoir with a full supply level of 125 m above sea level. The reservoir will be 232 km long and the incremental area of inundated land will be 85 km2 at full supply level. The project value is not finalized and may amount up to $10 billion. TIMELINE: Project is on hold pending Owner's decision to proceed. Coverage of this report is discontinued at this time.

Project Abandoned

Thermal Power Generation

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
17
Bidding Soon
258
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2026

Project location map

To Be Determined, Burnt Point Bdv, NL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.