Site work, environmental remediation, outdoor lighting and new construction of a mixed-use development in Toronto, Ontario. Conceptual plans call for the construction of a multi-residential development; retail development; and playground / park / athletic field.
The Villiers Island (formerly Cousins Quay) Precinct is one of the premier redevelopment sites on the waterfront, providing exceptional views of the Toronto skyline. It is expected to form a gateway from the West Don Lands and the East Bayfront to the rest of the Port Lands. The precinct has an area of approximately 54.28 acres (21.96 hectares) and is bounded by the Keating Channel to the north, Toronto Harbour to the West, Polson Slip to the south and Munition Street to the east. West of Cherry Street, the precinct includes both Essroc and Cousins Quays. Essroc and Cousins Quays are landfilled piers that are entirely publicly owned, but are currently utilized by Essroc, Toronto Port Authority, and GFL Environmental. The lands east of Cherry Street have a mix of public and private ownership with ongoing industrial uses, restaurant uses and sound studios. The scope of work may include but is not limited to; residential and commercial buildings, public buildings, walking paths, secondary streets and blocks, linkages between local parks and open spaces. It is expected that there will be TIMELINE: Owner is proceeding on construction of the Port Lands Flood Protection and Enabling Infrastructure completion expected mid-2024. Private development is proceeding as the 3C Waterfront Development, followed separately. Construction of flood protection works began in 2021 way and will proceed through 2024 through the River Valley, to install cut-off walls, for dewatering and excavation and demolition and site preparation and excavation. The owner has completed a Business and Implementation Plan for Villiers Island to describe the overall development concept and phasing plan, program requirements such as affordable housing and climate positive design, funding and financing, infrastructure costs and various asset management considerations. The owner is refining the scope of work. A Public Information Centre was held mid-March 2024. In Q3 2024, the project team will recommend to City Council a preferred approach for increasing densities on Villiers Island. The Council-endorsed preferred approach will inform an update to the 2017 Precinct Plan, resulting in more housing and affordable rental homes while respecting the overall vision for this new community. Future projects will be impacted by Council approval of zoning bylaw changes for Villiers Island and future recommendations of staff for the developable lands. Developers for future projects will be selected through Request For Proposals, timing is undetermined. Further update late 2024. *The Villiers Island Precinct Plan was approved by Toronto City Council in 2017. Environmental Assessment (EA) for this project was completed as part of the Lower Don Lands EA.
Conceptual
Multi-Residential
$50,000,000.00
Public - City
Environmental Remediation, New Construction, Outdoor Lighting, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2025
Multiple Locations, Toronto, ON
Related To This Project
Toronto, ON
Bid Date: Oct 19 2022
Toronto, ON
Bid Date: Oct 19 2022
Toronto, ON
--
Toronto, ON
Bid Date: Oct 25 2022
Toronto, ON
--
Toronto, ON
Bid Date: Nov 16 2022
Toronto, ON
Bid Date: Oct 19 2022
Toronto, ON
Bid Date: Nov 29 2022
Toronto, ON
Bid Date: Oct 19 2022
Toronto, ON
Bid Date: Oct 19 2022
Toronto, ON
Bid Date: Oct 19 2022
Toronto, ON
Bid Date: Nov 03 2022
Toronto, ON
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.