BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, environmental remediation and new construction of a mixed-use development in Scarborough, Ontario. Conceptual plans call for the construction of a municipal facility; for site work for a playground / park / athletic field; and road / highway.

SWP - Central Segment: Meadowcliffe to Grey Abbey; East Segment: Grey Abbey to East Point Park. Construction of a new waterfront park along the Lake Ontario shoreline from Bluffer's Park to East Point Park in Toronto, Ontario to create a destination park featuring a system of linked scenic landscapes both along the top of the bluffs and at the water's edge integrating shoreline regeneration, public access and safety, and natural heritage. The scope will include destination points for the general public with gathering places and public and washroom buildings. The preferred alternative includes the expansion of the existing beach by approximately 60 metres into Lake Ontario between Bluffers Park and Meadowcliffe. To achieve this Alternative, a headland will be constructed at the Meadowcliffe shoreline and the existing headland at the east end of Bluffers Park will be expanded. This Alternative will include an extension to the existing trail north of the expanded beach to meet Meadowcliffe. TIMELINE: Capital funding has been approved in the 2022 Capital Budget for Toronto Water for the West Segment, with funds allocated for completion of the environmental assessment Environmental Assessment (EA) has received Minister of the Environment, Conservation and Parks approvals. Project has been broken into segments; the Scarborough Bluffs west segment will proceed first, currently in detailed design & will continue into 2024. The City of Toronto, in consultation with Toronto and Region Conservation Authority, will seek senior government support for advancing the phased detailed design and implementation Scarborough Waterfront Project. Further updates may be available early 2025. The total capital investment for the project is currently estimated to be $170 million, over a 12-year implementation period.

Conceptual

Municipal

$10,000,000.00

Public - City

Environmental Remediation, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
123
Bidding Soon
2,500
All Active Projects
1,023
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2026

img_map_placeholder

Kingston Rd, Scarborough, ON


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.