Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 6, 2022 at 7:00 PM

Updated January 26, 2024

Site work for a water / sewer project in St. John's, Newfoundland. Conceptual plans call for site work for a water / sewer project.

Phased expansion to the existing plant for a secondary treatment system that will ensure an average daily flow of 160,000 m3. The expanded facility will handle wastewater from St. John's, Mount Pearl and Paradise. TIMELINE: Project is on indefinite hold pending funding. No timelines to proceed are available. Coverage of this report is discontinued at this time.

Project Abandoned

Water / Sewer

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
16
Bidding Soon
241
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2025

Project location map

209 Southside Rd, St. John's, NL

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed