BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a water / sewer project in Comox, British Columbia. Conceptual plans call for the construction of a water / sewer project.

The Comox Valley Sewer Conveyance Project is a multi-year construction project that will replace the pipes and upgrade the pump stations that move more than 14,000 cubic metres of raw sewage each day to the sewage treatment plant on Brent Road. This new system will route sewer pipes further inland where they will no longer be vulnerable to damage by waves, rocks, logs and weather. One of the most important goals of the project is to protect the shoreline and waters throughout the Comox Estuary, Point Holmes, Goose Spit coastlines, as well as Baynes Sound. TIMELINE: The conveyance component was separated out of the Liquid Waste Management Plan (LWMP) process back in 2021 and conducted separately as the Comox Valley Sewer Conveyance Project. Contracts were awarded to Maple-Knappett joint venture and Wacor Holdings for the design-build and design-bid-build portions of the project respectively. Construction of the forcemain is currently underway and is expected to be completed by spring 2026. The Stage 2 LWMP was submitted to the province last year, along with an addendum for the Sewer Extension South Project in spring 2024, which would see the inclusion of parts of Royston and Union Bay in the sewer service. Development of the Stage 3 LWMP is currently underway. The Joint Technical and Public Advisory Committee is expected to meet later this fall as well as in the spring to review the document and options. Public consultation will be conducted in the spring 2025, with submittal of the final plan anticipated in summer/fall 2025. Spring 2025: Present Stage 3 LWMP to the core area and south region communities. Summer/Fall 2025: Stage 3 LWMP submitted to province. Spring/Summer 2026: Provincial approval of Comox Valley Sewer Service LWMP. *The Comox Valley Sewer Conveyance Project will be constructed and funded in one phase but will include two separate construction contracts. One contract will be delivered as a Design-Build contract and will entail sections from the Courtenay Pump Station to the bottom of the Comox Road hill and then from the intersection of Lazo Road and Torrence Road to the treatment plant. The second contract will be a conventional Design-Bid-Build (DBB) contract for works generally through the Town of Comox Estimated construction costs range from $43M - $65M for the three conveyance options under consideration.

Conceptual

Water / Sewer

$65,000,000.00

Public - County

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
6
Bidding Soon
157
All Active Projects
69
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2025

img_map_placeholder

Multiple Locations, Comox, BC

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.