BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction and renovation of a mixed-use development in Charlotte, North Carolina. Completed plans call for the construction of a 175,000-square-foot transportation facility; and for the renovation of a 191,000-square-foot transportation facility.

As of March 26, 2020, construction is underway and will be complete by 2025. The new lobby expansion will include: - Expansion and renovation of the basement, baggage, and ticketing levels of the current terminal lobby. - Consolidation of the five security checkpoints into three larger, more efficient checkpoints. - Construction of: + A 146,000-square foot exterior canopy over the new vehicle roadway for protection and convenience of arriving and departing passengers, and + Two pedestrian overhead walkways to connect the new mezzanine level of the terminal directly to the hourly parking deck. + This project is anticipated to be complete by third quarter 2025. On October 28, 2019, City Council voted to: A. Approve a Construction Manager at Risk services contract with Holder, Edison Foard, Leeper - A Joint Venture, with a guaranteed maximum price of $500,277,842.21, B. Approve contract amendment #2 for $13,629,446.50 to Gresham Smith Partners for construction administration services for the construction phase of the Terminal Lobby Expansion project, C. Reject the low-bids submitted by Scarabee Systems and Technology B.V. and MacDonald Humfrey (Automation) Ltd for five Automated Security Lanes, D. Approve a contract in the amount of $3,651,000 to the lowest responsive bidder Vanderlande Industries, Inc for five Automated Screening Lanes, including four years maintenance and warranty for Checkpoint E equipment, E. Adopt a resolution authorizing transfer of the Automated Security Lanes without monetary consideration to the Transportation Security Administration as authorized under G.S. 160A274 and approve all contracts related to this transfer, F. Approve a contract in the amount of $2,795,573 with Wood Environment & Infrastructure Solutions, Inc. for testing and special inspection services in support of the Terminal Lobby Expansion project for an initial term of five years, and G. Authorize the City Manager to renew the contract for testing and special inspection services for up to two, one-year terms with possible price adjustments and to amend the contract consistent with the purpose for which the contract was approved.

Under Construction

Transportation Terminals

$500,000,000.00

Public - County

New Construction, Renovation, Site Work

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
61
Bidding Soon
1,158
All Active Projects
486
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 22, 2017

December 9, 2019

img_map_placeholder

5501 Josh Birmingham Pkwy, Charlotte, NC

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.