BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and addition to an educational facility in Miami, Florida. Conceptual plans call for the addition of a 49,433-square-foot educational facility.

The Ernest R. Graham University Center (Graham Center) expansion project (BT-921) is expected to add an estimated 59,362 GSF (44,300 NASF) to the existing facility. The objective of the project is twofold: first, it will expand programming and event spaces to meet the needs of the FIU community; second, it will provide additional student-use spaces and a military students suite. Constructed in 1974, the Graham Center began as a 78,000-square-foot student union. Since then, the Graham Center has grown to become FIU's primary hub for academic and affinity events, student services, academic instruction, departmental functions, and retail operations. As FIU continues to soar in national rankings, and be a magnet for millions internationally, it is imperative the Graham Center have facilities fitting of a world-class student union. This expansion represents FIU’s opportunity to cement itself as the go-to venue for research conferences, official governmental events and student programming. As a Carnegie R1 institution, FIU needs spaces to attract a variety of large-scale programs and events in the fields of technology, medicine, international affairs, commerce, and journalism. The existing event spaces in the Graham Center are fragmented and disintegrated. For example, there are no breakout rooms attached to the current ballrooms. Guests must exit and re-enter the building to access additional event spaces. What is more, existing breakout rooms are scattered throughout the building. The proposed project will have the required venue amenities such as breakout rooms, green rooms, and other interrelated spaces, to accommodate events in a centralized location. As of October 8, 2024, this project is in the planning phase. An architect and a construction manager has not been selected. A firm timeline for start of construction has not been determined. Construction is anticipated to be completed in Fall 2027. This project is included in the Florida International University's FY 2024-25 - 2028-29 CIP. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Educational

$36,121,654.00

Public - State/Provincial

Addition, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
47
Bidding Soon
1,102
All Active Projects
492
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.