BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a civil project in Glendale, Arizona. Design plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; and water / sewer project.

This project provides for the coordination with adjacent property owners, developers, public involvement, study, design, right-of-way acquisition, intergovernmental agreements, utility coordination, utility relocation, burying overhead facilities, construction and construction administration for the widening and construction of 67th Avenue between Pinnacle Peak Road and Happy Valley Road, a 16" water line and a regional storm drain system. The regional storm drain system will be cost shared with the Flood Control District of Maricopa County (FCDMC). The cross section of the roadway improvements varies from four lanes to six lanes. The improvements will include burying overhead facilities, installation of a 16" waterline along 67th Avenue and Pinnacle Peak Road, installation of a regional storm drain system, storm drain laterals and catch basins, saw cutting and removal of existing pavement, installation of new curb, gutter, valley gutter and apron, sidewalk, and handicap ramps, landscape, and raised landscaped medians, streetlights, interconnect conduit and fiber, future traffic signal improvements, striping and signage. This project also includes intersection improvements at Happy Valley Road and 67th Avenue. The project is included in the city's 2023-2032 Capital Improvement Program (CIP). As of February 2, 2022, an engineer has been selected for the project. Construction project delivery is expected to be through a construction delivery method. Although a firm timeline for construction has not been determined, construction is not expected to start prior to fiscal year 2023* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Roads / Highways

$16,704,328.00

Public - City

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
12
Bidding Soon
709
All Active Projects
249
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.